Bricks and mortar per m³

Standard bricks, 10 mm joints: brick counts per m³ and per m², and mortar net and gross quantities for five wall thicknesses.

Wall (mm)Bricks per m³Bricks per m²Mortar net (m³/m³)Mortar gross (m³/m³)Thousands per 10 m³
120552640.1930.2025.52
180535960.2170.2285.35
2405291280.2260.2375.29
3705221920.2360.2485.22
4905182560.2420.2545.18

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How many bricks per square metre in a 240 mm wall?
128 with standard bricks and 10 mm joints. A 120 mm wall takes 64, a 370 mm wall 192 and a 490 mm wall 256.
How much mortar per cubic metre of brickwork?
0.226 m³ net for a 240 mm wall, about 0.237 m³ with 5% loss. Thinner walls carry a higher mortar proportion.
How do I handle perforated bricks or AAC blocks?
Substitute the actual length, width and height, and keep the joint at 10 mm — or 3-5 mm when AAC is laid with thin-bed adhesive.