Bricks and mortar per m³

Standard bricks, 10 mm joints: brick counts per m³ and per m², and mortar net and gross quantities for five wall thicknesses.

Wall (mm)Bricks per m³Bricks per m²Mortar net (m³/m³)Mortar gross (m³/m³)Thousands per 10 m³
120552640.1930.2025.52
180535960.2170.2285.35
2405291280.2260.2375.29
3705221920.2360.2485.22
4905182560.2420.2545.18

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How many bricks per square metre in a 240 mm wall?
128 with standard bricks and 10 mm joints. A 120 mm wall takes 64, a 370 mm wall 192 and a 490 mm wall 256.
How much mortar per cubic metre of brickwork?
0.226 m³ net for a 240 mm wall, about 0.237 m³ with 5% loss. Thinner walls carry a higher mortar proportion.
How do I handle perforated bricks or AAC blocks?
Substitute the actual length, width and height, and keep the joint at 10 mm — or 3-5 mm when AAC is laid with thin-bed adhesive.
How much mortar does a cubic metre of brickwork take?
Solid brickwork 0.23-0.26 m³/m³, hollow clay 0.10-0.13, and AAC blocks only 0.08-0.12 because the units are large and the joints thin. Going from a 10 mm to an 8 mm joint cuts mortar by about 15%.
How many bricks does a tonne of mortar lay?
Mortar density is about 2000 kg/m³, so 1 t is roughly 0.5 m³. At 0.24 m³/m³ that beds about 2 m³ of brickwork, or 529 × 2 ≈ 1060 standard bricks.
How much cement is in a tonne of M5 mortar?
M5 takes about 200 kg of cement per cubic metre, so 1 t of mortar (about 0.5 m³) needs 100 kg — exactly two 50 kg bags. M7.5 takes about 120 kg and M10 about 140 kg.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.