Code Lookup calculators
8 code lookup tools: concrete cover, seismic class, column confinement zone, floor live load, maximum fire compartment, egress distance and width, and concrete strength assessment.
What this group solves
This group does not calculate — it looks up. Cover varies with exposure class and element type, seismic class depends on intensity, structural form and height together, confinement length depends on seismic class and column dimension, live load depends on occupancy, and fire compartment size depends on building class and whether sprinklers are fitted.
The trap is incomplete conditions. Give an intensity without a structural form and the seismic class cannot be fixed. Give a floor area without saying whether the building is single-storey or sprinklered and the compartment size cannot be checked. So every tool makes its preconditions explicit and refuses to answer until they are all supplied — one extra click is better than a number based on the wrong conditions.