Concrete calculators
19 concrete calculators: volume, formwork area, mix ratio, cement quantity, pour sections, curing time, joint spacing, mass concrete temperature, admixtures and blinding.
What this group solves
Concrete is the material where estimating errors cost the most: a cubic metre short means a cold joint or a second small pour, a cubic metre over is money in the skip, and once it starts to set there is no rework. These tools cover the whole chain — volume from the concrete volume calculator, formwork area, cement and aggregate from the mix ratio and cement quantity calculators, then curing and striking times to plan the sequence.
The two things most often missed on site are waste and temperature. Volume results already carry a waste allowance you can tune for pumping, direct discharge or barrows, and there is a separate tool for mass concrete that estimates peak core temperature and the core-to-surface differential from placement temperature, heat of hydration and ambient conditions. Blinding, strip footings, pile caps and construction joints each have their own tool rather than being forced through a generic volume formula.