Construction calculators
17 construction calculators: duration and line-of-balance programme, labour days, plaster and mortar, laydown area, wellpoint dewatering, bored piles, soil nails, striking time, waterproofing, gutters and asphalt.
What this group solves
This group is for planning: durations, flow, crew sizes, laydown space and dewatering choice. Duration comes from the number of sections, the cycle time per section and any lag, while labour days come from quantity divided by output norm — and the two must agree, because a programme that does not match its crew is the most common reason a method statement comes back.
The other half is specialist processes: dewatering sized from total inflow and yield per well, bored piles from diameter and depth, soil nails from face area and grout take, waterproofing from area plus laps and detail reinforcement, waterstops from joint length plus laps, and asphalt where bitumen ratio is not the same as bitumen content. Every one of these has an add-on that gets forgotten, and each is broken out separately here.
This group does not produce a single number, it produces a plan: duration sets how many crews you need, crew count sets the labour peak, and the peak sets site storage and temporary facilities. So sequence duration first, then the flow, then people and space. Working backwards from a headcount to a duration usually means the programme is already behind at the first floor.
Which one for your case
| Overall or per-block construction duration | Construction Duration Calculator |
| Flow-line scheduling — takt and step | Line-of-Balance Duration Calculator |
| Crew size back-calculated from quantities | Labour Days and Crew Calculator |
| How much laydown area the site needs | Material Storage Area Calculator |
| When formwork can be struck | Formwork Striking Time Estimator |
| Concrete volume for bored piles | Bored Pile Concrete and Rebar Calculator |
| Tightening torque for high-strength bolts | High Strength Bolt Torque Calculator |
| Waterproofing turn-up height in bathrooms | Bathroom Waterproofing Calculator |
| Waterstop plate length | Waterstop Calculator |
Where this group goes wrong
- Estimating duration as floor area ÷ output per man, ignoring structural form and season. Two 10,000 m² jobs differ by two months between frame and shear wall, and winter working in the north adds one to two months more; in the south, earthworks and basements need 15-20 rain days.
- Dividing scheduled man-days by the duration. Those are whole-job averages; site headcount has to be set on the peak, which runs 1.3-1.5 times the average. Staff to the average and the programme falls behind before topping out.
- Bored pile concrete without an overbreak factor. Design diameter gives a nominal volume; actual placement needs 1.05-1.2, and 1.3 in gravel or below the water table. On 100 piles of Φ800 × 20 m, missing 1.15 is 180 m³.
- Striking formwork on a blanket seven days. Soffit formwork follows matching-cured cube strength: 100% above 8 m span, which for C30 in winter can mean 21 days. Striking early is not a cracking problem, it is a collapse problem.