Foundations calculators
Foundation calculators: soil bearing capacity, single pile capacity, retaining wall stability, earth pressure coefficients, slope stability, piling, excavation support, dewatering and cofferdams.
What this group solves
This group answers the same question two ways: how much load the ground will take, and how to hold it back once you open it up. On capacity, start with the bearing capacity calculator — friction angle, cohesion, embedment and footing width settle the allowable pressure — then the pile capacity calculator for shaft and base resistance from SPT or undrained shear strength. On support, the earth pressure calculator gives K0, Ka and Kp, feeding the retaining wall check where sliding and overturning must both clear 1.5.
What goes wrong here is rarely the formula and almost always the parameters. Ignore groundwater and the three bearing terms need the submerged unit weight instead of the bulk one: sand drops from 18 to 8.2 kN/m³ and capacity falls by a third. Skip drainage behind a retaining wall and hydrostatic pressure doubles the horizontal thrust — most retaining wall collapses are drainage failures, not strength failures. And shaft and base resistance mobilise at settlements an order of magnitude apart, so adding both ultimate values and dividing once is optimistic, which the pile capacity notes spell out.
The entry point here is what you already have. With a ground investigation report showing SPT blows or undrained strength, go to pile capacity or bearing capacity. With only a soil description and a rough density, substitute typical values and lean on the factor of safety. For a retaining structure, fix the pressure case first — can the wall move or not — before checking stability. Getting that order wrong wastes the work: people size a wall, then look up the coefficient and use passive pressure, and end up with half the width actually needed, because Kp is nine times Ka at a 30 degree friction angle.
Excavation support has to be read as a set: earth pressure gives the horizontal force, slope stability asks whether the whole mass slides, piles and anchors provide the props, and dewatering sets the effective stress. They interact. Dewatering especially — every metre the water table drops adds 10 kPa of effective stress, which changes both base heave and settlement of everything nearby.
Which one for your case
| SPT N or cu from a report — what will one pile carry | Pile Capacity Calculator |
| Friction angle and cohesion — how much the ground under a footing takes | Bearing Capacity Calculator |
| Base width for a wall, sliding and overturning checks | Retaining Wall Stability Calculator |
| Active, passive or at-rest coefficients and thrust | Earth Pressure Calculator |
| Will the excavation slope stand, and at what factor of safety | Slope Stability Calculator |
| Piles or anchors for excavation support, and their spacing | Soldier Pile Calculator |
| High water table — wellpoint layout and spacing | Wellpoint Dewatering Calculator |
| Piles are in — concrete and reinforcement for the pile cap | Pile Cap Calculator |
Where this group goes wrong
- Using bulk unit weight below the water table. Sand at 18 becomes 8.2 kN/m³ submerged, the width term falls from 403 to 184 kPa and allowable pressure from 300 to 227 — a 24% over-prediction that only shows up as settlement months later, long after handover.
- Designing a retaining wall on soil pressure alone with no drainage. A 3 m wall carries 27 kN/m of active thrust; saturate the backfill and hydrostatic pressure adds 44 kN/m, multiplying the total by 2.6. Most retaining wall failures are drainage failures, not strength failures.
- Adding ultimate shaft and base resistance and dividing once. Shaft friction peaks at about 0.5% of the diameter while end bearing needs 5-10%, so they do not act together and the sum is 20% or more optimistic.
- Checking sliding but not eccentricity. Past e = B/6 the heel lifts and the peak base pressure exceeds the formula — the worked example passes both factors of safety at 1.75 and 2.78 yet reaches e = 0.324 m against a limit of 0.300 m, with −6 kPa at the heel.
- Issuing a construction drawing from correlations. SPT methods scatter by about 30%; a piled foundation needs a static load test or dynamic testing, not an estimate.