▩Stone Weight CalculatorMass per square metre and total for stone slabs by density.◎Steel Pipe Weight CalculatorMass per metre, per length and in total from OD and wall thickness.▬Steel Plate Weight CalculatorMass per square metre, per plate and in total from size and thickness.▮Round, Square and Flat Bar Weight CalculatorMass per metre and total for round, square and flat bar.∟Equal Angle Weight CalculatorMass per metre and total for equal angle steel.◍Stainless Steel Tube Weight CalculatorMass per metre and total for stainless tube.▤Aluminium Plate Weight CalculatorMass per square metre, per plate and in total for aluminium.▢Glass Weight CalculatorMass per square metre, per pane and in total for glass.▥Timber Volume and Weight CalculatorVolume, board area and weight for timber by species density.▦Sand and Gravel Tonnage ConverterCubic metres to tonnes by bulk density, with truck loads.▨Soil Haulage CalculatorNatural to loose volume, tonnes and truck loads without overloading.▣Cement Bag CalculatorTotal cement, exact bags and whole bags to order.⌷Section Steel Weight CalculatorPick a section type, enter height, flange width and thickness to get weight per metre, per piece and total tonnage.⌇Weld Consumable CalculatorWeld area, deposited metal and the electrode you actually need to buy.

What this group solves

Weight underpins everything quoted or hauled by the tonne — structural steel, rebar, sand and gravel, glass and stone. Get it wrong and the transport and lifting plan are wrong with it: a truck rated at 30 t loaded to 34 t is an overweight vehicle on the first weighbridge.

Everything here uses theoretical weight: steel at 7850 kg/m³, stainless at 7930, aluminium 2700, glass 2500, granite 2800, marble 2700 and timber 400-800 by species. Actual weighed material differs by 1-5%, heavier when the mill rolls to positive tolerance, so purchasing and freight need a margin while settlement uses theoretical weight.

Almost nothing here is calculated — it is tables and conversion, yet it underpins pricing, lifting and structural load: steel by theoretical mass, stone by bulk density, glass at 2.5 kg per square metre per millimetre of thickness. Get a density wrong by a factor and both the quotation and the lifting sling selection are wrong. The only rule: confirm the material and its density convention, multiply by volume, then sanity-check the order of magnitude.

Which one for your case

Mass per metre of steel tube, round or squareSteel Pipe Weight Calculator
Mass per square metre of steel plateSteel Plate Weight Calculator
Section properties of H-beams, I-beams and channelsSection Steel Weight Calculator
Mass per metre of angleEqual Angle Weight Calculator
Stainless plate or tubeStainless Steel Tube Weight Calculator
Aluminium sheet or extrusionAluminium Plate Weight Calculator
Glass mass for facade and rooflight loadingGlass Weight Calculator
Stone mass for bracket selectionStone Weight Calculator
Timber volume — cubic metres and board feetTimber Volume and Weight Calculator
Sand and soil between cubic metres and tonnesSand and Gravel Tonnage Converter
Bags of cement neededCement Bag Calculator

Where this group goes wrong

FAQ

How is steel pipe weight calculated?
Weight in kg/m = (outside diameter − wall thickness) × wall thickness × 0.02466, with both dimensions in millimetres. A 108 × 4 pipe works out at (108 − 4) × 4 × 0.02466 = 10.26 kg/m. That factor is for carbon steel; use 0.02491 for stainless.
How much does a square metre of steel plate weigh?
Thickness in millimetres × 7.85 kg. A 10 mm plate is 78.5 kg/m². Chequered plate adds about 2.5 kg/m². Plate is rolled to a negative tolerance but settlement uses nominal thickness times theoretical density.
How many tonnes in a cubic metre of aggregate?
It depends on bulk density and moisture: about 1.45-1.65 t/m³ for medium sand, 1.45-1.55 for crushed stone and 1.6-1.8 for graded base. Each 1% of moisture adds roughly 1% to the weight. Haulage is weighed, settlement is by compacted or loose volume — keep the two bases consistent.
Why use theoretical mass rather than weighbridge figures?
Schedules, settlement and lifting loads all use theoretical mass because it is reproducible. Sections are permitted about ±5% per piece and plate is supplied on negative thickness tolerance, so delivered mass typically differs by 3-5%. Tender and settlement must use the same basis or the two will not reconcile.
How many tonnes in a cubic metre of sand?
Medium sand bulks at 1450-1600 kg/m³, so about 1.45-1.6 t; coarse runs heavier and fine lighter. At 5% moisture add 50-80 kg/m³. Note bulk density is not apparent density — apparent density is around 2600, but loose heaps contain voids, so use bulk density.
How is glass weight calculated?
About 2.5 kg per square metre per millimetre. 6 mm monolithic is 15 kg/m²; 6+12A+6 insulating is 30 kg/m² (sum of the panes); 6+1.14PVB+6 laminated is about 30.3 kg/m²; 8+12A+8 is 40 kg/m². Facades and rooflights must be designed on these figures, not habit.
How much does a cubic metre of timber weigh?
Depends on species and moisture: softwood air-dry 500-550 kg/m³, hardwood 700-900, and green timber up to 900-1100. Log volume follows the GB/T 4814 tables, which allow for taper — not a simple πr²h. Sawn timber is measured length × width × thickness, with board feet used for pricing (1 board foot = 1/12 cubic foot).

Related data tables

Other groups

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.