16 M&E calculators: cable sizing, voltage drop, circuit load and breaker, derated current capacity, lighting, water demand, pipe sizing, drainage falls, pump head, heat load, duct area and supports.
What this group solves
Building services take off along two chains. Electrical is a three-stage check — current capacity, then protection, then voltage drop; picking a cable size is not the end of it, because long runs usually fail on the 5% drop limit rather than on current. Plumbing and HVAC are flow, diameter, then resistance: supply pipe size from fixture units and diversity, drainage from discharge units subject to minimum falls.
The bulk of installation labour hides in supports and accessories: duct hangers spaced by duct width, tray brackets by span, pipe brackets by diameter and temperature. These invisible items routinely account for more than 30% of installation labour, so the tools here return bracket counts, steel weight and anchor counts instead of leaving it to guesswork.