Rebar calculators
19 rebar calculators: theoretical weight, anchorage length and modification factors, lap length, cutting length, spacing and bar count, stirrups, mesh, splice percentage, bend deduction and tendons.
What this group solves
Two chains run through this group: weight and length. The weight chain starts from theoretical weight (d²/162) and extends to mesh, slabs, rafts and chair bars up to total tonnage. The length chain starts at anchorage, passes through laps, hooks and bend deductions, and ends at cutting length and stock optimisation — a cutting error is not a small overrun, it is a whole batch of scrap.
Every length tool follows the code: basic anchorage length times the modification factor, then times the seismic factor. Lap length is anchorage times 1.2, 1.4 or 1.6 depending on the percentage spliced at a section. Each parameter line states which clause it comes from — read that line before changing a factor, because this is the highest-rework category on the site.