Steel Design calculators

Steel connection and member checks: fillet weld throat and resistance, base plate area and thickness, column buckling and slenderness, beam span from the deflection limit, and section modulus. To EN 1993-1-8 and AISC Design Guide 1.

5 tools, most used first

⌐Steel Beam Span CalculatorThe depth is not looked up in a table — it falls out of the deflection limit.▭Section Properties CalculatorInertia governs deflection, section modulus governs strength — they are not interchangeable.◺Fillet Weld Strength CalculatorA 6 mm leg is not a 6 mm throat — capacity follows the 4.2 mm throat.▤Base Plate Design CalculatorThicker is not the answer — check the bearing area first, then the cantilever.⇕Column Buckling CalculatorHalf the effective length means four times the Euler load — but the design resistance differs by less, and how much depends on slenderness.

What this group solves

These are not the weight calculators. That group answers how heavy a section is and how much consumable a weld needs; this group answers whether the connection holds. In steel structures almost every failure is in a connection or a stability check rather than in the member — members are selected from tables, connections are made on site.

The four tools form one chain. The beam span tool back-calculates the inertia the deflection limit demands, the section properties tool checks whether the chosen profile has it, the column buckling tool asks whether the column fails first, and the fillet weld tool carries the force into the connection. The order matters: size the section before checking the weld, or you end up proving the weld is fine while the plate it sits on is not.

Three numbers are commonly wrong, and all three err on the unsafe side. A leg size is not a throat thickness — a 6 mm leg has a 4.2 mm throat and 43% less capacity. An effective length factor of 0.5 is theoretical; real fixity is hard to achieve. And a steel beam is usually governed by deflection rather than strength, so a section chosen on strength alone will bounce underfoot.

The biggest difference from concrete design is what governs. Concrete members are mostly strength-governed — get the reinforcement in and the section works. Steel members are mostly governed by deformation and stability, with strength often far from critical. So never stop at the strength check on steel: follow through to deflection for beams, slenderness for columns and detailing for connections. Skip that and the drawing calculates but the floor bounces.

The second thing easily missed is that the connection is weaker than the member. Steel failures happen almost entirely at connections: a fillet weld reaches half the parent metal strength, bolt bearing usually governs over shear, and the base plate hands load into concrete at a fifteenth of the steel strength. Design order therefore runs backwards — fix the connection type first and choose the member to suit, otherwise you end up with a section that cannot be connected and all the saving is spent on the joint.

Which one for your case

Span and load known, need the beam depthSteel Beam Span Calculator
Have a section size, need inertia and modulusSection Properties Calculator
Will the column buckle first, and at what slendernessColumn Buckling Calculator
How much a fillet weld carries, and the leg sizeFillet Weld Strength Calculator
Base plate thickness, and whether the concrete crushesBase Plate Design Calculator
Bolt shear against bearing, and which governsBolt Capacity Calculator
Need wind load before picking a memberWind Load Calculator
Only need the section weight and weld consumableSection Steel Weight Calculator

Where this group goes wrong

FAQ

Is weld strength the same as base metal strength?
No, a fillet weld reaches about half of it. The design strength is fu/(sqrt(3)·βw·1.25), so S275 at 430 MPa gives 234 MPa. A full-strength connection needs a full-penetration butt weld; lengthening a fillet does not help because the intensity per millimetre is capped.
How thick should a base plate be?
As a cantilever: t = m·√(2fp/(0.9Fy)), with m the projection beyond the column and fp the bearing pressure. At 1500 kN on C30 with a 350×350 plate under a 300×300 column that gives 18 mm, so specify 20. When the area is short, enlarge the plate rather than thickening it — halving the pressure cuts thickness by 29%, while extra thickness costs money squared.
Why can't the Euler load be used as capacity?
Because Euler assumes a perfectly straight member with no initial bow, residual stress or load eccentricity. Real members have all three and carry several times less. HEB200 at 4 m pinned-pinned: 7379 kN by Euler against 1548 kN of real buckling resistance. Euler only tells you whether slenderness is excessive.
What governs the depth of a steel beam?
Usually deflection, not strength. Steel is strong enough that a strength-sized section is too flexible. At 6 m and 20 kN/m the strength check needs 360 cm³ of section modulus while L/360 needs 9643 cm⁴ of inertia, one or two sizes larger. Inertia goes with depth cubed, so depth pays far better than flange thickness.
How does steel design differ from concrete design?
Concrete is mostly strength-governed, steel mostly deformation and stability-governed. The reason is the strength gap: 250 MPa against 30 MPa, a factor of eight. A strength-sized steel section is usually too flexible, so beams go back to deflection, columns to slenderness and joints to detailing rules. That is also why going deeper pays so much better than going thicker in steel.
Weld or bolt?
Depends on the load and the site. Welds are continuous, stiff and economical in steel, but need qualified welders and inspection, and overhead site welding is hard to control. Bolts are fast, demountable and easy to inspect, but slip and perform poorly in fatigue. The convention is weld in the shop, bolt on site, and combine them in critical joints with a bolted web and welded flanges. Seismic connections favour high-strength friction-grip bolts because slip dissipates energy.
Does a column base need a shear key?
When the shear exceeds the friction under the plate. Friction is roughly 0.4 times the axial load, so once horizontal shear passes that, friction alone will not do and a shear key welded under the plate and cast into the concrete — or shear on the anchor bolts — becomes necessary. In seismic regions almost every base needs a key, because the shear reverses and friction cannot be relied on.
Why is an I-section so weak on its minor axis?
Because the material sits at the ends of the major axis. HEB200 has 5696 cm⁴ about the strong axis against 2003 cm⁴ about the weak one, a factor of 2.8, and narrow-flange sections reach 10. An I-column therefore always needs a minor axis stability check and usually lateral restraint. Where moment is significant in both directions, a square or circular hollow section behaves the same either way.
How is steel protected in fire?
Steel keeps only 60% of its strength at 500°C and 30% at 600°C, so protection is mandatory. Three routes: intumescent or cementitious coating, boarding, or encasing the beam in concrete as part of a composite slab. Columns usually take coating or boarding, beams take coating, and slabs rely on the concrete. Thickness is set by the section factor — the heated perimeter over the area — not by surface area alone.