Unit conversion calculators
11 engineering unit converters: length, area, volume, weight, pressure and stress, force and load, temperature, angle, slope, flow and power. All the units that actually appear on drawings.
What this group solves
Unit conversion looks trivial and fails expensively: treating kN as kgf, MPa as kg/cm², or a 1:2 slope as 2%. Any one of those puts the answer out by an order of magnitude. These converters are grouped by physical quantity and include the units that really do appear on local drawings, including kilogram-force and the old engineering atmosphere.
Slope gets its own tool because it is the most misread. It has three forms — degrees, percent and ratio 1:n — and 30° is 57.7% and 1:1.73, not 1:30 and not 30%. Code limits for roofs and drainage falls are written in percent while drawings often show a ratio, and a mistake between them is a straight non-compliance.
Unit conversion looks trivial and is in fact where site accidents come from: MPa against bar, kN against kgf, m³/h against L/s — one place out and you are a factor of ten or a hundred wrong. The only rule is to bring every parameter into one system before substituting into a formula, never convert midway through. That is exactly what these tools are for: do the conversion on its own, then feed the result back.
Which one for your case
| Slope between percentage, degrees and ratio | Slope Converter |
| Length including feet, inches and Chinese chi | Length Unit Converter |
| Area including mu and hectares | Area Unit Converter |
| Volume including gallons and cubic feet | Volume Unit Converter |
| Mass including tonnes, jin and pounds | Weight Unit Converter |
| Pressure — MPa, bar, psi, kgf/cm² | Pressure Unit Converter |
| Force — kN, tf, lbf | Force Unit Converter |
| Temperature — °C, °F, K | Temperature Converter |
| Angle — degrees, radians, slope | Angle Converter |
| Flow — m³/h, L/s, L/min | Flow Rate Converter |
| Power — kW, horsepower, refrigeration tons | Power and Heat Converter |
Where this group goes wrong
- Mixing gauge units. 1 MPa = 10 bar = 10.2 kgf/cm² ≈ 145 psi. Grouting and pressure-test gauges come marked in either MPa or bar, and reading the wrong one can over-pressurise tenfold.
- Treating kN as kg. 1 kN ≈ 102 kg at g = 9.8, so estimating 1 kN = 100 kg is 2% conservative — but treating 1 kN as 1 kg is out by a factor of 100. This is the classic fatal error in lifting plans.
- Converting a temperature difference as if it were a temperature. A rise of 20 °C is a rise of 20 K but a rise of 36 °F — Fahrenheit differences multiply by 1.8 and must not carry the +32 offset.
- Assuming slope percentage and degrees are linear. i = tan(θ)×100%: 2% is 1.15°, 5% is 2.86°, 10% is 5.71° and 30° is 57.7%. The approximation holds at small angles and falls apart past about 10%.