Cement Bag Calculator

Total cement, exact bags and whole bags to order.

Inputs

m³
kg/m³
C25 about 320, C30 about 377, M10 mortar 300
kg
50 kg standard, 25 kg small bags also sold
%

Result

Formula

Total cementvolume × cement per m³
With wastetotal × (1 + waste%)
Exact bagswith waste ÷ bag weight
Whole bagsceil(exact bags)
Surplusbags × weight − with waste
Tonneswith waste ÷ 1000
1 m³ of C25 at 320 kg/m³ with 50 kg bags and 3% waste: 320.0 kg of cement, 329.6 kg with waste, 6.59 bags exactly — order 7 for a 20.4 kg surplus.

FAQ

Why 3% for cement waste?
Bagged cement loses 1-3% in opening, tipping and mixer residue, while silo discharge loses 0.5-1%. Admixtures and fly ash follow the same logic. Three percent is the norm; on small jobs with hand mixing and few bags, 5% is safer because waste scales differently between 20 bags and 200.
Can damp, caked cement still be used?
Lightly caked cement that crumbles to powder can be screened and used at a lower grade after strength testing; lumps that will not crush have already hydrated with over 20% strength loss and must be scrapped. Beyond three months in store, strength drops 10-20%, and after six months it must be retested. Store it covered, off the ground, 300 mm clear of walls and no more than ten bags high.
Why not simply add more cement?
Because more cement is not more strength. Excess cement raises heat of hydration, increases shrinkage and cracking, and reduces durability. Strength comes from a low water-binder ratio, not from extra cement. Codes set both a minimum, for durability, and an effective upper limit, for heat — C30 usually sits between 320 and 400 kg/m³.