# Concrete Mix Design Calculator

Work out cement, sand, gravel and water per cubic metre from the target grade and water-cement ratio.

- Page: https://jianzhujisuan.com/en/concrete-mix-ratio
- Category: Concrete (https://jianzhujisuan.com/en/c/concrete)
- Chinese version: https://jianzhujisuan.com/zh/concrete-mix-ratio.md
- Data checked: 2026-10-25

## Quick result

With the default inputs (Target grade C30, Cement strength class 42.5, Max aggregate size 31.5, Slump 90 mm, Sand ratio 38%): **Cement content 377 kg/m³**

The same m³ also takes 693 kg sand and 1,131 kg gravel (1 : 1.84 : 3.00)

## Inputs

| Parameter | Type | Default | Unit | Note |
|---|---|---|---|---|
| Target grade | select | C30 | — |  |
| Cement strength class | select | 42.5 | — | Strength surplus factor 1.16 for class 32.5, 1.00 for 42.5 and above |
| Max aggregate size | select | 31.5 | — |  |
| Slump | number | 90 | mm | 30-90 for direct placement, 120-180 for pumping |
| Sand ratio | number | 38 | % | Usually 38-45% for crushed stone pumped concrete |

## Formula

- **Target mean strength**: fcu,0 = fcu,k + 1.645σ (σ = 5.0 MPa)
- **Effective cement strength**: fce = γc × cement class
- **Water-cement ratio**: W/C = 0.53fce ÷ (fcu,0 + 0.53×0.20×fce)
- **Cement content**: mc = mw ÷ (W/C)
- **Total aggregate**: ms + mg = 2400 − mw − mc
- **Sand**: ms = (ms+mg) × sand ratio

## Worked example

C30 with 42.5 class cement, 31.5 mm aggregate, 90 mm slump and 38% sand: W/C 0.527, water 199 kg, cement 377 kg, sand 693 kg, gravel 1131 kg — a ratio of 1 : 1.84 : 3.00.

### Reference mixes by grade (per m³, medium sand, 31.5 mm aggregate)

| Grade | W/C | Cement (kg) | Sand (kg) | Gravel (kg) | Water (kg) |
|---|---|---|---|---|---|
| C20 | 0.62 | 290 | 750 | 1150 | 180 |
| C25 | 0.57 | 320 | 715 | 1155 | 182 |
| C30 | 0.53 | 377 | 693 | 1131 | 199 |
| C35 | 0.48 | 400 | 680 | 1125 | 192 |
| C40 | 0.44 | 440 | 665 | 1118 | 194 |


## Questions

### How do water-cement ratio and slump relate?

Water-cement ratio governs strength; slump governs workability, and the two pull against each other. For a given grade, a wetter mix either means more water (lower strength) or a superplasticiser (same strength, higher cost). Adding water on site is the worst trade: you save a few yuan of admixture and lose a whole strength grade.

### Why is my cement figure higher than the ready-mix supplier's?

Suppliers substitute fly ash, slag and admixtures, cutting cement by 15-30% while keeping total binder constant. This calculator assumes pure cement. With 20% fly ash, multiply cement by 0.8 and add fly ash at about 0.25 times the cement mass to hold the binder content.

### What sand ratio should I use?

Sand ratio trades workability against strength: too high loses strength, too low segregates and blocks the pump. Typical ranges for crushed stone: 33-38% at 30-70 mm slump, 38-43% at 70-120 mm, 40-45% for pumped concrete at 120-180 mm. Use the low end for fine sand and the high end for coarse sand; manufactured sand runs 2-3 points higher than natural sand.

## Related tools

- [Concrete Volume Calculator](https://jianzhujisuan.com/en/concrete-volume): Enter length, width and thickness to get the concrete volume you need and how many truck loads that is.
- [Formwork Area Calculator](https://jianzhujisuan.com/en/formwork-area): Pick a member type, enter section and length, and get the formwork contact area plus sheet and batten estimates.
- [Formwork Over-Height Calculator](https://jianzhujisuan.com/en/formwork-superhigh): Enter the support height and formwork contact area to get the over-height formwork quantity under the beam/slab and column/wall rules.
- [Cement Quantity Calculator](https://jianzhujisuan.com/en/cement-quantity): Get total cement, bag count and the cement/fly-ash split for a given volume and grade.
- [Concrete Pour Sequencing Calculator](https://jianzhujisuan.com/en/concrete-pour-plan): Divide a slab into strips and get the volume, truck count and duration for each pour.
- [Concrete Strength Converter](https://jianzhujisuan.com/en/concrete-strength-convert): Convert between grade, MPa, psi and kgf/cm², with cube-to-cylinder correction.

---

Generated by BuildCalc. All calculations run in your browser; no data is uploaded. Formulas follow national standards and common trade practice; local codes govern.
