# Construction unit conversions

The handful of conversions that actually get used, on one page — especially kN/kgf and MPa/kgf/cm², where most errors happen.

- Page: https://jianzhujisuan.com/en/construction-unit-table
- Data checked: 2026-10-25

## Table

| Quantity | Conversion | Where it matters |
|---|---|---|
| Length | 1 m = 1000 mm = 100 cm = 3.2808 ft = 39.370 in | Drawings in mm, bills in m |
| Length | 1 in = 25.4 mm | Pipe and section sizes |
| Area | 1 m² = 10.7639 ft² = 10000 cm² | Imported material priced per ft² |
| Volume | 1 m³ = 1000 L | Concrete, mortar, water |
| Volume | 1 m³ = 35.3147 ft³ = 1.30795 yd³ | US drawings and equipment |
| Mass | 1 t = 1000 kg = 2204.6 lb | Steel and aggregate by the tonne |
| Force | 1 kN = 1000 N = 101.97 kgf ≈ 0.102 tf | Structural loads are in kN |
| Force | 1 kgf = 9.80665 N | Older drawings use kgf |
| Stress | 1 MPa = 1000 kPa = 1 N/mm² = 10.197 kgf/cm² | C30 means 30 MPa, about 300 kgf/cm² |
| Pressure | 1 atm = 101.325 kPa = 1.033 kgf/cm² | Pumps and compressed air |
| Power | 1 kW = 860 kcal/h = 1.3596 hp | HVAC and plant selection |
| Energy | 1 kcal = 4.1868 kJ, 1 kW·h = 3600 kJ | Energy conversion |
| Slope | 30° = 57.74% = 1:1.732 | Codes use percent |
| Flow | 1 m³/h = 0.2778 L/s = 16.667 L/min | Pumps and pipe sizing |

## US customary units: read this first on an American or British drawing

| US unit | In metric | Reverse | Where you meet it |
|---|---|---|---|
| 1 psi | 6.89476 kPa | 1 kPa = 0.14504 psi | US steel and concrete strength, pressures |
| 1 ksi | 6.89476 MPa | 1 MPa = 145.04 psi | US structural steel grades (Fy = 50 ksi for A992) |
| 1 psf | 47.8803 Pa | 1 kPa = 20.885 psf | Floor live loads, roof loads |
| 1 ksf | 47.8803 kPa | 1 MPa = 20.885 ksf | Bearing capacity (2 ksf is about 96 kPa) |
| 1 kip | 4.44822 kN | 1 kN = 0.2248 kip | Column axial loads, prestress forces |
| 1 kip/ft | 14.5939 kN/m | 1 kN/m = 0.06852 kip/ft | Line loads on beams |
| 1 in·lb | 0.112985 N·m | 1 N·m = 8.851 in·lb | Torque on small bolts |
| 1 ft·lb | 1.35582 N·m | 1 N·m = 0.7376 ft·lb | Torque on large bolts, impact energy |
| 1 inH₂O (60°F) | 249.089 Pa | 1 kPa = 4.015 inH₂O | Duct static pressure, cleanroom differential |
| 1 ft³ | 0.0283168 m³ | 1 m³ = 35.315 ft³ | Concrete by the cubic yard, timber by the board foot |
| 1 yd³ | 0.764555 m³ | 1 m³ = 1.30795 yd³ | The unit US ready-mix concrete is sold in |
| 1 board foot | 0.00235974 m³ | 1 m³ = 423.78 board ft | North American timber (1 board foot = 1 ft² one inch thick) |
| 1 acre | 4046.86 m² | 1 ha = 2.47105 acre | Site areas, land acquisition |
| 1 short ton | 907.185 kg | 1 t = 1.10231 short ton | US steel and aggregate are priced by the short ton |
| 1 US gal | 3.78541 L | 1 m³ = 264.17 US gal | Coatings and admixtures (mind the imperial gallon at 4.546 L) |

Every factor is derived from a defined value (1 in = 25.4 mm and 1 lb = 0.45359237 kg are definitions, not measurements), so there are no edition differences. Pressure is where people come unstuck: 1 MPa = 145 psi, two orders of magnitude. Read 30 MPa as 30 psi and the concrete comes out at 0.2 MPa; read 4000 psi as 4000 MPa and the number is useless. US concrete is ordered in 3000, 4000 and 5000 psi, which is 20.7, 27.6 and 34.5 MPa.

## How to use

- Convert everything to base units (m, kg, s, N) before calculating, and do not skip steps.
- Structural work uses kN and MPa only — mixing in kgf is the single most common comment at design review.
- When a drawing shows 1:n, convert to percent before comparing with a code limit.
- Scan the drawing for units before anything else. If psi, psf, kip or ft-lb appears anywhere, convert the whole document - never work half in US units and half metric.
- Bring pressures to MPa, forces to kN and moments to N·m before they go into any formula.
- Concrete strength in psi divides by 145 to give MPa; rebar grade in ksi multiplies by 6.895.

## Common mistakes

- Treating kN as kgf — a factor of 9.8, which loses an order of magnitude in the load.
- Treating MPa as kg/cm² — a factor of 10.2, which makes concrete appear ten times stronger.
- Reading a 2% fall as 2° — 2% is 1.15°, nearly a factor of two.
- Treating psi as MPa - a factor of 145. 4000 psi concrete is 27.6 MPa; it is not 4000 MPa and it is not 4 MPa.
- Treating kip as kN - a factor of 4.448. 100 kip is 445 kN, not 100 kN.
- Treating a short ton as a metric tonne - 9.7% out. Ordering 100 short tons of steel gets you 90.7 t, and freight and duty quoted on 100 t will not reconcile.

## Questions

### How many kg is 1 kN?

About 102 kgf. So a floor rated at 200 kg per square metre is roughly 2 kN/m².

### How many kgf/cm² is 1 MPa?

10.197, rounded to 10 on site. C30 concrete is 30 MPa, about 300 kgf/cm².

### What angle is a 2% fall?

arctan(0.02) = 1.15°, i.e. 20 mm per metre.

### What is 4000 psi in MPa?

4000 × 0.00689476 = 27.58 MPa, usually written 27.6 MPa or taken as C28. US concrete comes in 3000, 4000, 5000 and 6000 psi, which is 20.7, 27.6, 34.5 and 41.4 MPa.

### What is a kip?

1 kip = 1000 lbf = 4.448 kN - a kilopound-force. US structural drawings use it for column axial loads and prestress forces, written kip or k. Multiply by 4.448 to get kN.

### How do psf and kPa convert?

1 psf = 47.88 Pa and 1 kPa = 20.885 psf. The common US live loads of 40, 50 and 100 psf are 1.92, 2.39 and 4.79 kPa. Since 1 kPa = 1 kN/m², the kN/m² figure is the same number.

### Fahrenheit to Celsius — why is 32 added sometimes and not others?

There are two different quantities. A temperature value takes the offset, °F = °C × 9/5 + 32, so 30 °C is 86 °F. A temperature difference does not: Δ°F = Δ°C × 9/5, so a 20 °C differential is 36 °F. Structural temperature effects and concrete curing differentials are both the second kind — apply the offset to one of those and a 20 °C range becomes 68 °F, trebling the load.

### What are Btu/h and a ton of refrigeration in kW?

1 W = 3.41214 Btu/h, so 1 kW is 3412 Btu/h. One US ton of refrigeration is 12,000 Btu/h, which is 3.51685 kW. A 36,000 Btu/h unit is therefore 3 tons or 10.55 kW. US mechanical schedules are written in Btu/h and tons, while Chinese and European equipment is rated in kW — never carry the number across.

## Related calculators

- [Slope Converter](https://jianzhujisuan.com/en/slope-converter): Enter rise and run to get the slope as a percentage, in degrees, as a ratio and as rise per metre.
- [Pressure Unit Converter](https://jianzhujisuan.com/en/unit-pressure): MPa, kPa, bar, psi and kgf/cm² — every unit at once.
- [Force Unit Converter](https://jianzhujisuan.com/en/unit-force): kN, N, tonne-force, kgf and lbf for loads and lifting.