# Cost Breakdown Totaliser

Six items into one total, with cost per m² and a missing-item check.

- Page: https://jianzhujisuan.com/en/cost-summary
- Category: Costing (https://jianzhujisuan.com/en/c/costing)
- Chinese version: https://jianzhujisuan.com/zh/cost-summary.md
- Data checked: 2026-10-25

## Quick result

With the default inputs (Gross floor area 1000 m², Concrete (incl. pumping) 168000 CNY, Rebar (incl. fixing) 253000 CNY, Formwork 154000 CNY, Scaffolding 30000 CNY, Other labour 520000 CNY, Other materials and plant 1015000 CNY): **Total construction cost 214.00 10k CNY**

## Inputs

| Parameter | Type | Default | Unit | Note |
|---|---|---|---|---|
| Gross floor area | number | 1000 | m² |  |
| Concrete (incl. pumping) | number | 168000 | CNY |  |
| Rebar (incl. fixing) | number | 253000 | CNY |  |
| Formwork | number | 154000 | CNY |  |
| Scaffolding | number | 30000 | CNY |  |
| Other labour | number | 520000 | CNY |  |
| Other materials and plant | number | 1015000 | CNY |  |

## Formula

- **Total cost**: concrete + rebar + formwork + scaffolding + other labour + other materials
- **Cost per m²**: total ÷ gross floor area
- **Share of each item**: item ÷ total × 100%
- **Source of each figure**: the total from each tool, not the unit rate

## Worked example

A 1000 m² frame house: 168000 concrete, 253000 rebar, 154000 formwork, 30000 scaffolding, 520000 other labour and 1015000 other materials. The six add to CNY 2,140,000 in all, at 2140 per m² — rebar 11.8% and other materials 47.4%.

## Questions

### Why does this not match the cost-per-m² estimator?

They answer different questions. The estimator multiplies a benchmark rate for similar buildings by the floor area and returns a figure including levies and tax, for investment appraisal and scheme comparison. This page adds up the actual cost of each item as you entered it, and whether tax is included depends on what you typed. Normally direct cost plus overheads, profit, levies and tax lands near the benchmark. Ten to twenty percent apart is normal; a factor of two means one item is on the wrong basis.

### Should labour be a separate line?

Check what the other pages already include. The concrete, rebar, formwork and scaffolding tools each already carry their own labour — pumping, fixing, erection and striking — so the other-labour line here covers only bricklaying, plastering and services installation. Entering the same labour twice inflates the total and hides it in the percentages. Decide the basis of each item before you fill anything in; this is where costing goes wrong most often.

### Can this total be quoted directly?

No. It is direct cost; a quote still needs overheads, profit, levies and tax, which is the unit-rate build-up. Preliminaries, provisional sums and main-contractor attendance also sit outside the itemised costs. What the totaliser is good for is showing where the money goes and which share looks wrong — rebar above thirty percent usually means the steel content or the waste allowance is overstated.

## Related tools

- [Cost per Square Metre Estimator](https://jianzhujisuan.com/en/cost-per-m2): Cost per m² and in total by structure, region and finish.
- [Concrete Cost Calculator](https://jianzhujisuan.com/en/concrete-cost): Material, pumping and the all-in rate per cubic metre.
- [Rebar Cost Calculator](https://jianzhujisuan.com/en/rebar-cost): Material, fabrication, fixing and the all-in cost per tonne.
- [Labour Cost Build-up Calculator](https://jianzhujisuan.com/en/labor-cost): Day rate build-up with overheads, levies and tax.
- [Formwork Cost Calculator](https://jianzhujisuan.com/en/formwork-cost): Amortisation, labour, support and the all-in rate per m².