# Cylinder Volume Calculator

Volume, capacity, surface areas and weight for any cylinder.

- Page: https://jianzhujisuan.com/en/cylinder-volume
- Category: Area and volume (https://jianzhujisuan.com/en/c/area-volume)
- Chinese version: https://jianzhujisuan.com/zh/cylinder-volume.md
- Data checked: 2026-10-25

## Quick result

With the default inputs (Diameter 1 m, Height 3 m): **Cylinder volume 2.356 m³**

## Inputs

| Parameter | Type | Default | Unit | Note |
|---|---|---|---|---|
| Diameter | number | 1 | m |  |
| Height | number | 3 | m |  |

## Formula

- **Radius**: r = d ÷ 2
- **Base area**: A = π r²
- **Volume**: V = π r² h
- **Lateral area**: A = π d h
- **Total area**: A = π d h + 2π r²
- **Capacity**: V(L) = V(m³) × 1000

## Worked example

A 1 m diameter, 3 m high cylinder: 0.7854 m² base, 2.356 m³ volume, 9.425 m² lateral area, 10.996 m² total, 2356.2 L capacity and 2.356 t when full of water.

## Questions

### Why does my tank always hold less than calculated?

Three reasons: using the outside diameter — a tank 4 m outside with 200 mm walls is 3.6 m inside, 19% less volume; ignoring freeboard, since the water line sits 200-300 mm below the top; and ignoring internals such as columns, baffles and ladders. Use the bore, deduct freeboard, and the error falls under 2%.

### Does a round or square column use less formwork?

For equal area, round uses less because the circle has the shortest perimeter. But curved panels cost over twice as much as flat ones and need bespoke hoops, so for small and medium sections square is cheaper overall. Round steel forms only pay on large diameters, piers and silos where the cost is amortised.

### Can the cylinder formula be used for a conical stockpile?

No — a cone uses V = πr²h/3, one third of the cylinder for the same base and height. A natural sand or gravel pile is closer to a frustum with a flattened top, so use V = πh/3 × (R² + Rr + r²); treating it as a cone overstates by 10-20%.

## Related tools

- [Room Area Calculator](https://jianzhujisuan.com/en/room-area): Floor, ceiling, walls, skirting and volume, all at once.
- [Wall Area and Paint Calculator](https://jianzhujisuan.com/en/wall-area): Net wall area with openings deducted, plus paint and filler.
- [Roof Area Calculator](https://jianzhujisuan.com/en/roof-area): True sloped roof area, rafter length and ridge rise from pitch.
- [Circle and Sector Calculator](https://jianzhujisuan.com/en/circle-calc): Circle area and circumference plus sector, arc, chord and segment.
- [Triangle Area Calculator](https://jianzhujisuan.com/en/triangle-area): Area from three sides, with angles, inradius and circumradius.
- [Battered Pit Volume Calculator](https://jianzhujisuan.com/en/pit-volume): Top dimensions and frustum volume from base size, depth and batter.

---

Generated by BuildCalc. All calculations run in your browser; no data is uploaded. Formulas follow national standards and common trade practice; local codes govern.
