# Movement Joint Width Calculator

Joint width from thermal movement plus allowances.

- Page: https://jianzhujisuan.com/en/expansion-joint-width
- Category: Temporary Works (https://jianzhujisuan.com/en/c/temporary-works)
- Chinese version: https://jianzhujisuan.com/zh/expansion-joint-width.md
- Data checked: 2026-10-25

## Quick result

With the default inputs (Structural length between joints 60 m, Temperature range 30 ℃, Expansion coefficient 1.0 ×10⁻⁵/℃, Construction and seismic allowance 20 mm, Joint type Expansion joint (two-way)): **Minimum joint width 60 mm**

## Inputs

| Parameter | Type | Default | Unit | Note |
|---|---|---|---|---|
| Structural length between joints | number | 60 | m |  |
| Temperature range | number | 30 | ℃ |  |
| Expansion coefficient | number | 1.0 | ×10⁻⁵/℃ |  |
| Construction and seismic allowance | number | 20 | mm |  |
| Joint type | select | Expansion joint (two-way) | — |  |

## Formula

- **ΔL = α × ΔT × L**: α ≈ 1.0×10⁻⁵ per ℃, L in mm
- **Width = 2×ΔL + allowances**: two-way movement
- **Round up to 10 mm**: 

## Worked example

60 m structure with a 30 ℃ range: 18.0 mm one way, 36.0 mm two way, plus 20 mm gives 56.0 mm, rounded to 60 mm. A settlement joint still needs checking to 50-120 mm by ground conditions.

## Questions

### Why two-way movement?

Both sides move. In heat the two blocks close the gap, in cold they separate; the sealant and waterstop must both compress and stretch, so twice the movement gives travel in both directions. Sizing on one direction only lets the joint open too far in winter, tearing the waterstop - and that is where leaks begin.

### Can a construction strip replace a movement joint?

A strip solves construction-period shrinkage and differential settlement, but it gets concreted and closes - after that the structure is continuous again and long-term thermal movement still needs a real joint (or prestressing, sliding layers and similar). It is not a permanent joint.

### What is wrong with a wider joint?

The waterstop and sealant must accommodate more movement, raising material and workmanship demand; the floor slab is interrupted, so shear keys or dowels, finishes, waterproofing and fire separation all become harder; and in hospitals or labs a wide gap is harder to keep clean. Joint width is a balance - adequate, not generous.

## Related tools

- [Scaffolding Calculator](https://jianzhujisuan.com/en/scaffolding): Enter the wall perimeter and scaffold height to get the area plus tube, coupler and board quantities.
- [Formwork Turnover Calculator](https://jianzhujisuan.com/en/formwork-turnover): Initial formwork area and replacement allowance from total area and cycles.
- [Full Scaffold Material Calculator](https://jianzhujisuan.com/en/full-scaffold): Standards, tube length and weight, couplers and board area.
- [Formwork Lateral Pressure Calculator](https://jianzhujisuan.com/en/formwork-pressure): Smaller of the two GB 50666 formulas, plus effective head height.
- [Roof Drainage Calculator](https://jianzhujisuan.com/en/roof-drainage): Catchment area to flow to downpipe count.
- [Roof Slope Layer Calculator](https://jianzhujisuan.com/en/roof-slope-layer): Average thickness and volume from span and slope.

---

Generated by BuildCalc. All calculations run in your browser; no data is uploaded. Formulas follow national standards and common trade practice; local codes govern.