Area and volume formulas

The bottom layer of every take-off: plane areas and solid volumes with the symbols spelled out.

ShapeArea / volumePerimeter / surface
RectangleA = a × bC = 2(a + b)
TriangleA = b × h ÷ 2C = a + b + c
TrapezoidA = (a + b) × h ÷ 2C = a + b + c + d
ParallelogramA = b × hC = 2(a + b)
CircleA = πr² = πd²/4C = 2πr = πd
SectorA = πr² × θ ÷ 360Arc L = πrθ ÷ 180
AnnulusA = π(R² − r²)—
EllipseA = πabPerimeter ≈ π[3(a+b) − √((3a+b)(a+3b))]
Regular polygon (n sides)A = nR²sin(2π/n) ÷ 2C = 2nRsin(π/n)
CuboidV = a × b × hS = 2(ab + ah + bh)
CylinderV = πr²hSide 2πrh, total 2πr(r + h)
ConeV = πr²h ÷ 3Side πrl
Frustum of a coneV = πh(R² + Rr + r²) ÷ 3Side π(R + r)l
SphereV = 4πr³ ÷ 3S = 4πr²
PyramidV = base area × h ÷ 3—
FrustumV = h ÷ 6 × [S₁ + S₂ + 4S₀]S₀ is the mid-section area

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How do I calculate the area of a circle?
π times the radius squared. A 1 m diameter circle has a 0.5 m radius and an area of 0.785 m².
How do I calculate the volume of a cylinder?
Base area times height, πr²h. A 0.5 m diameter, 10 m high cylinder is 1.96 m³.
Why use the frustum formula for excavation?
Because side slopes make the top and bottom different sizes, and mean area × height understates consistently — by up to 10% depending on slope and depth.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.