Material density table

Check this before converting volume to weight — bulk and solid density differ by a factor of two, and picking the wrong one ruins the tonnage.

MaterialDensity (kg/m³)State
Plain concrete2200~2400Solid
Reinforced concrete2400~2500Solid, usually 2500
Lightweight aggregate concrete1400~1900Solid
Cement mortar2000Solid
Compo mortar1900Solid
Clay brick1800Solid, about 2.6 kg each
AAC block500~700Solid, grades B05-B07
Hollow concrete block1200~1400Solid, by void ratio
Cement (bulk)1200~1300Loose
Cement (particle)3100For mix design
Medium sand (dry)1450~1550Bulk
Medium sand (wet)1600~1800Bulk, 5-8% moisture
Crushed stone1450~1550Loose, 5-40 mm
Lime putty1350Paste
Carbon steel7850Solid
Stainless steel7930Solid, 304
Aluminium2700Solid
Glass2500~2560Solid
Granite2800Solid
Marble2700Solid
Softwood500~600Solid, air dry
Hardwood700~900Solid, air dry
Bitumen1000~1100Solid
Asphalt concrete2300~2400Solid, compacted
Water1000At 4°C
Clay (natural)1800~2000In situ
Sandy soil (natural)1600~2000In situ
EPS board20~30Solid
XPS board30~40Solid
Rock wool board100~150Solid

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How many tonnes in a cubic metre of sand?
Bulk density of medium sand is 1450-1650 kg/m³, so 1.45-1.65 t per cubic metre; use the top of the range when wet.
How much does a cubic metre of reinforced concrete weigh?
2400-2500 kg, and 2500 is the normal design figure. That is solid density, not loose.
What is the density of cement?
Particle density is 3100 kg/m³ while bulk density is only 1200-1300. Mix design uses particle density; storage and haulage use bulk.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.