Rebar Hook Length Calculator

Added length for three hook types, with the seismic tail check.

Inputs

mm
mm

Result

Formula

180° hookadd 6.25d (includes a 3d tail)
90° hooktail + 0.5d
135° stirrup hookseismic max(10d, 75) + 0.5d; else max(5d, 75) + 0.5d
Seismic tailat least 10d and 75 mm
Φ8 stirrup with seismic detailing: tail max(10×8, 75) = 80 mm plus 1.9×8 = 15.2 mm of arc, so 95.2 mm per hook (the familiar 11.9d). A closed stirrup has two hooks, adding 190.4 mm.

FAQ

Why do plain bars need hooks but ribbed bars do not?
Different bond mechanics. Plain bars are smooth and rely on a 180° hook to mechanically anchor; ribbed bars develop anchorage through rib interlock, so hooks can be omitted. The hook on a plain bar is structural - make it too short and the bar pulls out at the joint.
Why both 10d and 75 mm?
They address different failure modes. 10d scales the tail with bar diameter; 75 mm is an absolute floor so that small bars (Φ6 gives only 60 mm at 10d) cannot slip out once concrete crushes. Taking the larger value means 75 mm governs for small bars and 10d for large ones.
Do hook allowance and bend deduction double-count?
No, but order matters: subtract bend deductions from the out-to-out total to get centreline length, then add the hook allowance. They act at different places - deductions at intermediate bends, allowance at the end. For a stirrup with four 90° bends and one 135° hook: out-to-out minus 4×deduction plus hook allowance.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.