Rebar weight table

Every bar size from 6 mm to 40 mm: kg per metre, weight per 9 m and 12 m bar, metres per tonne.

BarWeight (kg/m)9 m bar (kg)12 m bar (kg)Metres per tonne
Φ60.2222.002.664505
Φ6.50.2602.343.123846
Φ80.3953.564.742532
Φ100.6175.557.401621
Φ120.8887.9910.661126
Φ141.2110.8914.52826
Φ161.5814.2218.96633
Φ182.0018.0024.00500
Φ202.4722.2329.64405
Φ222.9826.8235.76336
Φ253.8534.6546.20260
Φ284.8343.4757.96207
Φ326.3156.7975.72158
Φ367.9971.9195.88125
Φ409.8788.83118.44101

All values are computed from the stated formulas; ranges show the usual spread. Use measured data or the local code where it differs.

How to use this table

Common misuse

Calculate the actual number

Other reference tables

FAQ

How do I calculate rebar weight per metre?
0.00617 × diameter², i.e. d²/162. That is 0.888 kg/m for 12 mm and 3.85 kg/m for 25 mm.
How many metres of 12 mm bar in a tonne?
1000 ÷ 0.888 ≈ 1126 m, or 125 lengths of 9 m and 94 lengths of 12 m.
Why does theoretical weight differ from the weighbridge?
Theoretical weight uses 7850 kg/m³ and nominal dimensions; ribs, rolling tolerance and corrosion shift the real figure by 1-4%.
Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.