Temperature Converter

Celsius, Fahrenheit and Kelvin, with site temperature references.

Inputs

Result

Formula

Celsius to Fahrenheit°F = °C × 1.8 + 32
Fahrenheit to Celsius°C = (°F − 32) ÷ 1.8
Celsius to KelvinK = °C + 273.15
Kelvin to Celsius°C = K − 273.15
Rankine°R = (°C + 273.15) × 1.8
IntervalsΔ1°C = Δ1.8°F — only differences scale
20°C is 68°F, 293.15 K or 527.67 °R. At 5°C concrete cures normally; at −2°C it needs insulating or heating, or the early frost damage permanently reduces strength.

Temperatures that matter on site

TemperatureSituationRequirement
0°CFreezing pointWater freezes; concrete needs frost protection
5°CWinter concretingWinter rules apply below 5°C for five consecutive days
10°CAsphalt placementNot normally placed below 10°C
20°CCube curingStandard curing at 20 ± 2°C
60°CSteam curing capUsually not above 60°C to avoid strength regression
100°CBoiling pointWater boils at atmospheric pressure

FAQ

Why can't Celsius be doubled to get Fahrenheit?
Because the zeros differ: 0°C is 32°F, not 0°F, so the offset must be applied before scaling. The “double and add 30” shortcut is only a rough estimate — 2°C out near 20°C but 12°C out near 100°C, useless for measuring asphalt or concrete temperature.
What temperature triggers winter concreting rules?
Winter rules apply when the daily mean stays below 5°C for five consecutive days. Then thermal blankets, heated enclosures or antifreeze admixtures are required, with placing temperature not below 5°C (2°C for mass concrete). The earlier and colder the freeze, the greater and more permanent the strength loss.
Kelvin and Celsius differ by a constant, so why keep both?
Kelvin starts at absolute zero, which physics formulas such as the ideal gas law and radiation laws require, otherwise negatives break the equations. Celsius puts zero at the freezing point of water, which suits daily use, and site work, material standards and codes all use it. The conversion is simply 273.15.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.