AAC Block Quantity Calculator

Block count, volume and adhesive from wall size and block format.

Quick answer

With the default inputs: Wall length 10 · Wall height 3 · Openings area 0 m² etc.Total blocks 253 blocks

Edit the inputs below to recalculate.
Length LHeight HThickness T
Block counts use the net wall area; joints are 3-5 mm, thinner than brickwork.

Inputs

m²
2-4 mm for thin-bed adhesive, 15 mm with ordinary mortar
%

Result

Total blocks
253blocks
Net wall area30.00m²
Blocks per m²8.17blocks/m²
Blocks per m³40.8blocks/m³
Wall volume6.00m³
Block volume (net)5.88m³
Volume per block0.0240m³
Joint mortar volume0.118m³
Adhesive (1.6 kg/mm·m²)148.3kg

Thin joints need proprietary adhesive, not ordinary cement mortar, which shrinks and cracks. AAC absorbs water quickly so blocks are not wetted before laying, but dust must be brushed off.

Formula

Net areaA = length × height − openings
Blocks per m²n = 1 ÷ ((length + joint) × (height + joint))
Total blocksN = ceil(A × n × (1 + waste))
MortarV = wall volume − blocks × block volume
Per m³n ÷ wall thickness
A 10 m × 3 m wall, 200 mm thick, 600×200×200 blocks with 3 mm joints and 3% waste: 8.17 blocks per m², 253 blocks in total, 6.00 m³ of wall and about 0.05 m³ of mortar.

AAC block formats and blocks per square metre (3 mm joints)

Format L×H×T (mm)Blocks per m²Blocks per m³Weight per block (kg)
600×200×1008.1781.77.5
600×200×1508.1754.511.3
600×200×2008.1740.815.0
600×200×2508.1732.718.8
600×250×2006.5232.618.8
600×300×2005.4227.122.5

How to work it out

  1. Net wall area A = length × height − opening area, measured to the opening size with no deduction for frames.
  2. Blocks per square metre n = 1 ÷ ((block length + joint) × (block height + joint)). AAC uses thin-bed adhesive with 2-3 mm joints, not 10 mm mortar.
  3. Total N = ⌈A × n × (1 + waste)⌉. Waste is normally 3-5%, rising to 8% with heavy cutting.
  4. Adhesive = net area × unit usage, typically 4-6 kg/m² depending on joint thickness.
  5. Match wall thickness to block thickness (100/120/150/200/250 mm); AAC is not laid two blocks thick.

Where it goes wrong

Material and cost

AAC blocks run 280-380 per m³ (about 320 for B06), thin-bed adhesive 600-900 per tonne. A 200 mm wall takes about 0.2 m³ of block and 5 kg of adhesive per square metre — roughly 75 per m² in material and 110-140 per m² including labour.

On site

Basis

FAQ

Why not use ordinary cement mortar with AAC?
Ordinary mortar needs 15 mm joints, shrinks more and is stiffer than AAC, so it cracks at the joints; AAC also draws water out fast, leaving the mortar weak. Use thin-bed adhesive at 2-4 mm, fully bedded, and never stronger than the block itself.
Should AAC blocks be wetted before laying?
No — the key difference from fired brick. AAC absorbs slowly, and wetting leaves the surface saturated so the adhesive cannot cure properly, reducing strength; excess water also causes shrinkage cracking. Brush off dust, and in hot dry weather mist lightly but leave no free water.
What waste allowance should I use?
3% for plain walls with a uniform format, 5-8% where there are many openings, corners and irregular areas, and 10% where much cutting is needed. AAC cuts easily but breaks easily, and transit damage counts too — 100 mm boards break far more than thicker ones.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.