Bathroom Waterproofing Calculator

Floor, walls and detail strips, with coating and membrane quantities.

Quick answer

With the default inputs: Room length 2.0 · Room width 1.8 · Wall upturn height 1.8 etc.Total waterproofing area 15.84 m²

Edit the inputs below to recalculate.
WallFloorWall upturn height mMembrane
Use 1.8 m at the shower and 0.3 m elsewhere; room length and width are internal clear sizes with shafts deducted.

Inputs

1.8 m in showers, 0.3 m elsewhere, 0.75 m at baths
Deducted — no upturn across the doorway
kg/m²
JS polymer two coats 1.8-2.2 kg/m², PU 2.0-2.5
%
Laps and cutting, usually 10-20%

Result

Total waterproofing area
15.84m²
Floor area3.60m²
Floor perimeter7.60m
Wall area12.24m²
Wall run after deducting door6.80m
Detail strips2.28m²
Coating required31.7kg
Drums at 20 kg2cans
Membrane with waste18.2m²
Area per m² of floor4.40×

Wall area = (floor perimeter − door width) × upturn height; the doorway has no upturn, so deducting it is mandatory or you overcount by 5-10%. Code upturn heights: at least 1.8 m in showers, 0.75 m beside baths and squat pans, 0.3 m on other walls, 1.2 m at washbasins. Corners, pipe penetrations and drains take 300 mm wide detail strips, listed separately here. Finish with a 24-hour ponding test at least 20 mm deep.

Formula

Floor areaA = length × width
Wall runL = 2 × (length + width) − door width
Wall areaA = L × upturn height
Total areaA = floor + wall
CoatingG = A × coverage
MembraneA = total × (1 + waste)
A 2.0×1.8 m bathroom with 1.8 m upturn, 0.8 m door and 2.0 kg/m²: 3.6 m² floor, 12.24 m² walls, 15.84 m² total, 31.7 kg coating, 18.2 m² membrane and 2.28 m² of detail strips.

How to work it out

  1. Floor area = length × width. That is the base, and the floor also needs a 1-2% fall to the drain.
  2. Wall heights follow the location: at least 1.8 m in showers, 0.3 m above a bath rim, 0.3 m elsewhere. Wall area = (length + width) × 2 × height − door opening.
  3. Where a shower sits in a corner, both adjoining walls go to 1.8 m, not just one. A wall shared with a bedroom wardrobe is best done full height.
  4. Detailing: 300-500 mm reinforcement at every internal and external corner, 200 mm around pipe penetrations, and a threshold upstand at the door.
  5. Total = floor + walls + detailing, times (1 + waste). Liquid membrane at 1.5-2.0 kg/m² for 1.5 mm; sheet by area ÷ roll area.

Where it goes wrong

Material and cost

JS cementitious 15-30 CNY/m² at 1.5 mm, polyurethane 25-50, sheet 25-55. Supply and apply 40-80 CNY/m². A 4.5 m² bathroom costs 800-2000 CNY in total.

On site

Basis

FAQ

How high should wall waterproofing go?
Under the residential interior waterproofing code: at least 1.8 m in showers and no lower than the shower head; 0.75 m beside baths and squat pans; 1.2 m at basins; 0.3 m elsewhere. Lightweight partitions (AAC, steel stud) need the full wall to full height because they wick water. This is the most complained-about leak location — do not cut it to 0.3 m to save material.
Coating or membrane?
Floors suit liquid coating: it forms a seamless film that copes with pipe penetrations, drains and corners, and is easy to apply in tight rooms. Membrane has laps, which fail in confined and detailed areas — it belongs on large roofs and basement walls. A coating-plus-membrane build-up is more expensive but reliable. If walls are tiled, choose a coating compatible with tile adhesive or the tiles will debond.
How is the ponding test done?
Once the membrane has fully cured — about 48 hours for coatings — plug the drain and doorway, pond at least 20 mm deep for 24 hours, then inspect the ceiling below for leaks and check that the level has not dropped appreciably. No leak and no drop means pass. Any failure must be repaired and retested, and a second test is done after finishing. Both need photo records and signatures.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Bathroom Waterproofing Calculator. 2026-10-25. https://jianzhujisuan.com/en/bathroom-waterproof

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.