Bored Pile Calculator
Concrete, overbreak and rebar cage weight for bored piles in one go.
Also known as drilled shaft · bored cast in situ pile · rotary bored pile
With the default inputs: Pile diameter 800 mm · Pile length 30 m · Number of piles 10 pcs etc.Total concrete 165.9 m³
Use your own dimensions ↓Inputs
Result
| Section area | 0.5027m² |
| Concrete per pile (with overbreak) | 16.59m³ |
| Main bar unit weight | 2.468kg/m |
| Total cage weight | 8.88t |
| Average reinforcement ratio | 54kg/m³ |
How this is worked out
Bored piles are cast under slurry, so laitance and slurry mix into the top and base; the top length is trimmed off, hence a 1.05-1.15 overbreak factor on concrete. Main-bar weight uses the empirical m = d²×0.00617 (d in mm), standard for HRB400 ribbed bar. The cage total counts main bars only - stirrups, stiffening rings and spacers add about 8-12%. Typical reinforcement is 60-120 kg/m³; if the ratio looks way off, recheck bar count and diameter.
Next up: High Strength Bolt Torque Calculator · Plaster and Render Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Section area | A = πD²/4 |
| Concrete per pile | V₁ = A·L·(1+overbreak%) |
| Total concrete | V = V₁·n |
| Main bar unit weight | m = d²×0.00617 (kg/m) |
| Cage weight | W = m·L·bars·piles / 1000 (t) |
Quantities per metre by diameter (from this page's formulas, 10% overbreak, 12 × 20 mm bars)
| Diameter (mm) | Section area (m²) | Concrete (m³/m) | Cage (kg/m) | 30 m pile (m³) |
|---|---|---|---|---|
| 600 | 0.283 | 0.311 | 29.6 | 9.33 |
| 800 | 0.503 | 0.553 | 29.6 | 16.59 |
| 1000 | 0.785 | 0.864 | 29.6 | 25.92 |
| 1200 | 1.131 | 1.244 | 29.6 | 37.32 |
| 1500 | 1.767 | 1.944 | 29.6 | 58.32 |
| 2000 | 3.142 | 3.456 | 29.6 | 103.67 |
Choosing the drilling method (typical conditions, not code limits)
| Method | Ground it suits | Below water table | Support | Typical diameter (mm) | Main cost |
|---|---|---|---|---|---|
| Rotary auger (spin rig) | Cohesive soils, silt, sand, gravel at moderate N | Yes, with slurry or casing | Slurry / full casing | 600-2000 | Large spoil volume, needs a hard standing |
| Rotary drilling (direct / reverse circulation) | Clay, silt, fine to medium sand | Yes | Slurry | 600-1600 | Slow; reverse circulation cleans the base better |
| Percussion / chisel | Cobbles, boulders, weathered rock | Yes | Slurry | 600-1500 | Good rock penetration but slow |
| Continuous flight auger (dry) | Cohesive soils and silt above the water table | Not suitable (fails below water) | None | 400-800 | No slurry and fast, but fails the moment water appears |
| Full casing (oscillator / rotator) | Unstable ground, collapse-prone holes, next to existing buildings | Yes (dry inside the casing) | Steel casing | 800-1500 | Expensive and heavy, but no slurry and no vibration |
Basis
- JGJ 94-2008, §5.3 — vertical bearing capacity of a single pile
- JGJ 94-2008, Table 5.3.5 — shaft and end resistance parameters by soil type
- JGJ 94-2008, §5.2 — pile spacing and group effects
FAQ
What overbreak allowance should I use?
Why does the cage weight only count main bars?
Why overpour bored piles, and by how much?
What reinforcement ratio is normal for a bored pile?
Can this tool work out the pile capacity?
How do I reconcile concrete against the client after trimming the pile top?