10 costing calculators: cost per square metre, concrete and rebar cost, labour, formwork and scaffold cost, VAT, unit rate build-up, progress payments and variations.

10 tools, most used first

☰Labour Cost Build-up CalculatorDay rate build-up with overheads, levies and tax.¥Cost per Square Metre EstimatorCost per m² and in total by structure, region and finish.◫Concrete Cost CalculatorMaterial, pumping and the all-in rate per cubic metre.≡Rebar Cost CalculatorMaterial, fabrication, fixing and the all-in cost per tonne.▤Formwork Cost CalculatorAmortisation, labour, support and the all-in rate per m².⊞Scaffolding Cost CalculatorRent by duration plus erection labour, giving total cost.%Construction VAT CalculatorOutput tax, input credit, VAT payable and surcharges.∑Unit Rate Build-up CalculatorBuild up an all-in unit rate from labour, material and plant.⌛Progress Payment CalculatorAdvance recovery, retention and the amount due this period.✎Variation Order Cost CalculatorFull cost of a variation and the change against the original rate.

What this group solves

Costing turns a quantity into money: multiply by rate, add preliminaries, apply overheads and tax. A unit rate is labour plus material plus plant plus management plus profit plus risk allowance, and each component has its own basis — apply the wrong basis and the whole rate drifts by more than 10%.

The other tools are about cash flow. VAT at the general rate or the simplified rate behaves very differently once input credit is considered; progress payments are made at the contract percentage but held back for retention (typically 3%) and recovered for mobilisation advance; variations are priced against an existing similar rate before a new rate is built up. These are the items that turn into disputes at final account, so price them before you negotiate.

The arithmetic here is simple; the errors are all about convention — tax-inclusive or not, preliminaries included or not, what base progress payments deduct retention and advance from. The same job can differ by more than 20% depending on which convention is used. Establish 'who is this number for' first: a tender, a cost check and a payment application all use different conventions.

Which one for your case

Quick cost per square metreCost per Square Metre Estimator
Elemental cost for concrete, rebar, formwork or scaffoldConcrete Cost Calculator
Converting between tax-inclusive and tax-exclusive pricesConstruction VAT Calculator
Building a composite unit rateUnit Rate Build-up Calculator
How much to claim this periodProgress Payment Calculator
Pricing a variation orderVariation Order Cost Calculator

Where this group goes wrong

FAQ

How do I estimate cost per square metre?
Total cost divided by gross floor area. Indicative ranges for the structure and finishes package run about 1200-1800 per m² for low-rise masonry, 1800-2600 for mid-rise frame-shear wall and 2200-3200 for high-rise shear wall. Location, specification and the number of basement levels matter more than the structural form, so correct against recent local settlements.
What goes into a unit rate?
Labour, material including delivery and storage, plant and tools, overheads, profit and a defined risk allowance. Statutory fees and tax sit outside the unit rate. Under a bill-of-quantities approach the unit rate is one component of the all-in rate — do not double-count tax inside it.
How is construction VAT calculated?
Under the general method, output tax is 9% of the net-of-tax income and input tax is recoverable. Under the simplified method, tax is 3% of the tax-inclusive income divided by 1.03, with no credit. Simplified treatment is available for labour-only and owner-supplied-material work; which is cheaper depends on how much input tax you can actually recover.
What VAT rate applies to construction services?
9% under the general method and 3% under the simplified method (available for labour-only, client-supplied material and pre-2016 projects). Small-scale taxpayers use a 3% levy. A quotation must state whether it is tax-inclusive or exclusive, or the two sides will settle on different assumptions.
What does a composite unit rate include?
Labour, materials (including freight and testing), plant and machinery, enterprise overhead, profit and an allowance for defined risk. It excludes statutory fees and taxes, and excludes preliminaries, which are billed separately.
What does construction cost per square metre look like?
Housing 1800-2600 CNY/m² shell and 3000-4500 fitted out; offices 3500-6000; industrial 1200-2000; underground car parks 3000-4000. Region, structural form and finish standard swing this enormously — it is good for a sanity check, not for a quotation.
When is retention released?
Within 14 days of the defects liability period expiring, which is usually one year and by contract no more than two. The cap on retention was cut from 5% to 3% in 2017. Where a bank guarantee is provided in place of retention, the employer may not also withhold cash.