Ceiling Grid Calculator

Main and cross runner lengths, hangers and fittings from ceiling size.

Quick answer

With the default inputs: Ceiling length 6 · Ceiling width 4 · Main runner spacing 1.2 etc.Main runner 21.0 m

Edit the inputs below to recalculate.
Main runner spacin mCross tee spacing m
Main runners sit at 900-1200 mm, cross tees at 400 mm (300 mm at board joints). Hanger spacing follows the main runners, not the tees.

Inputs

Usually 0.9-1.2 m
400 mm for plasterboard, 300 mm for strip ceilings
Not more than 1.2 m, within 300 mm of runner ends
%

Result

Main runner
21.0m
Ceiling area24.00m²
Cross tees63.0m
Perimeter trim21.0m
Hanger rods24bars
Runner clips70pcs
Cross tee clips105pcs
Main runner per m² incl. waste0.88m/m²
Cross tee per m² incl. waste2.63m/m²

Main runner length is area ÷ spacing with 5% waste, excluding changes of level and feature ceilings. Rod length depends on the void and is counted separately, one expansion anchor per rod.

Formula

AreaA = length × width
Main runnerL = A ÷ spacing × (1 + waste)
Cross teesL = A ÷ spacing × (1 + waste)
PerimeterL = 2 × (length + width) × (1 + waste)
HangersN = (floor(L÷s)+1) × (floor(W÷s)+1)
A 6 × 4 m ceiling with 1.2 m main runners, 0.4 m cross tees and 1.2 m hangers at 5% waste: 24 m², 21.0 m of runner, 63.0 m of cross tee, 21.0 m of trim and 24 hangers.

How to work it out

  1. Fix the hierarchy first: main runners (load bearing) run along the long axis, furring channels run across them.
  2. Main runner rows = room width ÷ main spacing, rounded up then plus one — both edges need a runner. 1.2 m for walk-on ceilings, 1.2-1.5 m otherwise.
  3. Furring rows = room length ÷ furring spacing, rounded up plus one. Spacing must not exceed 400 mm, because a 1200 mm plasterboard needs three supports.
  4. Hangers = main rows × (length ÷ hanger spacing + 1). Hanger spacing matches the main runners at 1.2 m, but no hanger may be more than 300 mm from a runner end.
  5. Perimeter channel by room perimeter, plus 5% for corners and shaped edges.

Where it goes wrong

Material and cost

Galvanised channel 6-12 CNY/m, hanger sets (with anchor and clip) 2-4 CNY each, labour 25-40 CNY/m². Complete ceiling with board and labour 80-140 CNY/m², shaped ceilings from 150.

On site

Basis

FAQ

Main runner versus cross tee?
Main runners carry the load directly from the hangers, have the larger section and run parallel to the short side; cross tees clip underneath and support the boards, their spacing setting the board span. Main spacing follows the hanger layout (within 1.2 m), cross spacing follows board strength (400 mm for plasterboard). Swap them and the ceiling sags.
Why cap hanger spacing at 1.2 m?
Main runners deflect under their own weight and the boards; wider spacing turns them into long simply-supported spans that sag in the middle and crack at the joints. The code caps spacing at 1.2 m and requires support within 300 mm of runner ends, since an overhanging end sags first. Heavy items like luminaires need their own hangers.
What is typical grid content per m²?
For a normal plasterboard ceiling: about 0.9-1.1 m/m² of main runner, 2.5-2.8 m/m² of cross tee and roughly 0.8 m/m² of perimeter trim, less in larger rooms. Calculating is more reliable than rules of thumb because small rooms carry proportionally more trim.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Ceiling Grid Calculator. 2026-10-25. https://jianzhujisuan.com/en/ceiling-grid

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.