Chair Bar Calculator
Enter slab area, thickness and chair spacing to get the count, length per chair, total rebar length and weight.
With the default inputs: Slab area 100 m² · Slab thickness 0.12 · Chair spacing 1 etc.Total chair bar weight 17.9 kg
Edit the inputs below to recalculate.Inputs
Result
| Chair bar count | 100pcs |
| Length per chair | 0.455m |
| Leg height | 0.090m |
| Total rebar length | 45.5m |
| Weight per m² | 0.18kg/m² |
| Weight per metre | 0.395kg/m |
Assumes the common flat-top plus two 45° legs shape, excluding laps and waste. Other shapes (U-form, triangular, plastic chairs) have quite different lengths.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Chair count | N = ceil(area ÷ spacing²) |
| Leg height | h = thickness − cover (top + bottom) |
| Length per chair | L = top flat + 2 × h × √2 |
| Total weight | W = N × L × 0.00617 × d² |
How to work it out
- Chair count N = ⌈slab area ÷ chair spacing²⌉. At 1 m spacing it is one per square metre; at 0.8 m about 1.56.
- Chair height h = slab depth − top and bottom cover combined. It is not the slab depth, or the top layer will protrude through the surface.
- Bar length L = top flat + 2 × h × √2 for a triangular chair, where h × √2 is the leg length.
- Total length = N × L; weight = total length × 0.00617 × d².
- The top flat runs 0.15-0.25 m, long enough to support the upper mesh — shorter and it slips off.
Where it goes wrong
- Setting chair height to the slab depth — deduct both covers (typically 15 + 15 = 30 mm), or the top layer ends up with zero cover and rusts from the outside in.
- Multiplying area by a fixed factor — 1 m and 1.2 m spacing differ by 30%, so compute ⌈area ÷ spacing²⌉.
- Using Φ6 chairs — too soft, the top layer collapses underfoot; use Φ8 at minimum, and Φ10-Φ12 above 200 mm slabs.
Material and cost
Chairs are 3-6% of slab steel — a small quantity that must not be omitted. Φ8 runs about 1.6 per metre: a 100 m² slab at 1 m spacing and 120 mm deep takes about 100 chairs of 0.5 m, roughly 80 in material.
On site
- Tie or tack-weld chairs to the upper mesh; simply resting them there lets them wander during placing.
- Above 200 mm, or where waterproofing matters, steel section stools are more stable than bent bar chairs.
- Chairs are temporary works steel and settled against actual usage; they are rarely drawn, so keep pre-cover records.
Basis
- GB 50204-2015 Code for acceptance of concrete structures, Chapter 5 (bar position and cover)
- GB 50666-2011 Code for construction of concrete structures, Section 5.4
- 16G101-1 Standard drawings for flat-slab detailing
FAQ
Do chair bars count in the rebar total?
What spacing should I use?
Plastic chairs or steel chairs?