算BuildCalc

Circle and Sector Calculator

Circle area and circumference plus sector, arc, chord and segment.

Quick answer

With the default inputs: Diameter 2 · Central angle 90°Circle area 3.1416 m²

Edit the inputs below to recalculate.
Diameter mCentral angle °
Diameter is measured through the centre; the central angle only affects the sector and segment results, so any value gives the same full circle.

Inputs

°

Result

Circle area
3.1416m²
Radius1.000m
Circumference6.2832m
Sector area0.7854m²
Arc length1.5708m
Chord length1.4142m
Segment area0.2854m²
Triangle inside sector0.5000m²
Inscribed square side1.414m
Cylinder volume at 1 m height3.1416m³

π is taken as 3.14159265. Segment area is sector minus triangle; beyond 180° the triangle flips and the tool handles it by absolute value. The circumference is what you need for circular footings and tank formwork or waterstop lengths.

Formula

Radiusr = d ÷ 2
AreaA = π r²
CircumferenceC = π d = 2π r
Sector areaA = π r² × (θ ÷ 360)
Arc lengthL = 2π r × (θ ÷ 360)
Chordc = 2r × sin(θ ÷ 2)
Segment areaA = sector − 0.5 r² sin θ
A 2 m diameter at 90°: radius 1.000 m, area 3.1416 m², circumference 6.2832 m, sector 0.7854 m², arc 1.5708 m, chord 1.4142 m and segment 0.2854 m².

How to work it out

  1. Convert diameter to radius: r = d ÷ 2. It looks trivial, but substituting diameter for radius is the most frequent error and gives a result four times too large.
  2. Circle area A = π r², circumference C = π d. This pair covers circular columns, round footings and circular tanks.
  3. Sector area = π r² × (θ ÷ 360); arc length = 2π r × (θ ÷ 360). θ is the central angle, not an inscribed angle.
  4. Chord length c = 2r × sin(θ ÷ 2), used for curved beams and arch spans.
  5. Segment area = sector − triangle = π r² × (θ÷360) − 0.5 r² sin θ. This is the section area for curved concrete, arched slabs and arch lintels.
  6. Break complex shapes into rectangles, sectors and segments, compute each and add. Faster and less error-prone than integrating or interpolating tables.

Where it goes wrong

Material and cost

Formwork and reinforcement for circular elements are measured on circumference and arc length, and curved formwork costs 30-50% more than straight because of fabrication and propping. A circle also has 12% more perimeter than a rectangle of equal area, raising envelope and formwork cost.

On site

Basis

FAQ

Pipes are quoted in inches — how does that relate to area?
The inch is 25.4 mm, but nominal diameter DN is neither bore nor outside diameter. Flow area must use the bore: a DN50 galvanised pipe has about 53 mm bore against 50 mm for plastic, a 12% area difference and therefore 12% in flow at the same pressure.
Why is formwork cheaper for a circular footing?
A circle encloses the most area for a given perimeter — equivalently, it has the least perimeter for a given area. A 10 m² square footing has 12.65 m of edge against 11.21 m for a circle, an 11% saving. But curved formwork needs bespoke panels and more bracing, so it rarely pays except on silos, tanks and piers.
When is segment area actually used?
Arched openings, the sides of curved beams, the junction of a circular wall with a straight one, and openings cut for pipes. Another frequent case: estimating repair mortar for a spalled or honeycombed patch on a circular section, where measuring the chord with a rule and the sagitta with a feeler gauge beats trying to measure an angle.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Circle and Sector Calculator. 2026-10-25. https://jianzhujisuan.com/en/circle-calc

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.