Column Buckling Calculator
Half the effective length means four times the Euler load — but the design resistance differs by less, and how much depends on slenderness.
Also known as buckling load · euler buckling · slenderness ratio
With the default inputs: Section area A 7810 mm² · Minor axis second moment I 56960000 mm⁴ · Yield strength fy 235 MPa etc.Buckling resistance 1548.4 kN
Use your own dimensions ↓Inputs
Result
| Effective length Lcr | 4000mm |
| Radius of gyration r | 85.4mm |
| Slenderness λ | 46.8 |
| Reference slenderness λ1 | 93.9 |
| Relative slenderness λ̄ | 0.499 |
| Reduction factor χ | 0.844 |
| Euler critical load Pcr | 7379kN |
| Squash load Npl | 1835kN |
| Buckling resistance Nb,Rd | 1548kN |
| Strength used | 84% |
How this is worked out
A column rarely fails by crushing; it fails by buckling, and almost every steel compression member is stability-governed. Slenderness Lcr/r is the dividing line: below 40 the member is stocky and reaches 95% of yield on curve a, 88% on curve c; above 120 it is slender with a reduction factor around 0.4 on curve c, so only four tenths of the strength is available. The easy thing to under-estimate is effective length — pinned at both ends K = 1.0 against fixed-fixed K = 0.5 is a factor of four in the Euler load, since it enters squared. The design resistance Nb,Rd is not four times anything: at a slenderness of 46.8 here, changing K from 1.0 to 0.5 lifts chi from 0.844 to 0.975, only 16% more capacity. Only genuinely slender columns approach the factor of four, because there Nb falls roughly as 1/lambda_bar squared — so "fixed ends halve the steel" is a long-column statement. Real fixity is hard to achieve (bolted connections slip, base plates rotate), which is why codes rarely let you use 0.5 and 0.7 to 0.8 is normal. The Euler load is theoretical: no initial imperfection, no residual stress, no load eccentricity, so it is always higher than reality — here 7379 kN against a resistance of 1548 kN, a factor of 4.8. Treat Euler as the ceiling of elastic stability, never as capacity.
Next up: Steel Beam Span Calculator · Section Properties Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Effective length | Lcr = K·L |
| Slenderness | λ = Lcr/r, r = √(I/A) |
| Reference slenderness | λ1 = 93.9·√(235/fy) |
| Reduction factor | Φ = 0.5[1+α(λ̄−0.2)+λ̄²], χ = 1/(Φ+√(Φ²−λ̄²)) ≤ 1 |
| Resistance | Nb,Rd = χ·A·fy/γM1 |
| Euler load | Pcr = π²EI/Lcr² |
Basis
The codes below are listed for comparison. This calculator returns EN 1993-1-1 values only.
- Implemented: EN 1993-1-1 (Europe / Commonwealth) - the values this calculator returns
- EN 1993-1-1, §6.2.4 — cross-section resistance in compression
- EN 1993-1-1, §6.3.1.2 — flexural buckling Nb,Rd = χ·A·fy/γM1
- EN 1993-1-1, §6.3.1.3 — λ1 = 93.9·√(235/fy) and the slenderness λ
- EN 1993-1-1, Table 6.1 — buckling curves a0 to d
- EN 1993-1-1, Table 6.2 — imperfection factor α by curve and steel grade
FAQ
What is the difference between buckling and yielding?
What value of K should I use?
Why can't the Euler load be used as capacity?
What slenderness is too high?
What to calculate next
These jobs are done back to back on site — follow the steps to work through the whole sequence.
Steel: span to connectionStep 3 of 4
- 1Steel Beam Span Calculator
- 2Section Properties Calculator
- 3Column Buckling Calculator
- 4Fillet Weld Strength Calculator
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Column Buckling Calculator. 2026-10-25. https://jianzhujisuan.com/en/column-buckling