Admixture Dose Calculator

Percentage dose to kg per m³ and per batch, with the new w/b ratio.

Quick answer

With the default inputs: Cement 300 kg/m³ · Fly ash 60 kg/m³ · Slag 0 kg/m³ etc.Admixture per m³ 7.20 kg/m³

Edit the inputs below to recalculate.
Cement1Sand1.84Gravel3Water0.53Per 1 m³ of concrete (schematic)
Dosage is a percentage of total binder (cement plus fly ash and slag), not cement alone; water reduction acts on the water content.

Inputs

kg/m³
kg/m³
kg/m³
%
kg/m³
%
bags

Result

Admixture per m³
7.20kg/m³
Total binder360kg/m³
Dose on binder2.00%
Per 100 kg binder2.00kg
Per batch2.40kg
Water after reduction148.8kg/m³
Original w/b0.486
w/b after reduction0.413

The dose applies to total binder (cement + fly ash + slag + silica fume), not cement alone - counting only cement under-doses the mix once SCMs are used, which shows up as poor water reduction and fast slump loss. Batch quantities are usually a few hundred grams to a couple of kilograms, so weigh them on a 0.1 kg scale. Use the measured water reduction for that dose, never the datasheet maximum; the real dose must come from trial mixes.

Formula

Binder = cement + fly ash + slag + silica fumenot cement alone
Admixture = binder × dose%per m³
Water = base water × (1 − reduction)measured reduction
w/b = water / binder
Cement 300 + fly ash 60 gives 360 kg/m³ of binder at 2.0%, so 7.2 kg/m³ of admixture. With base water 175 and 15% reduction, water falls to 148.8 kg and w/b goes from 0.486 to 0.413. For a two-bag batch the factor is 0.333 and the dose is 2.40 kg.

How to work it out

  1. Total binder = cement + fly ash + slag. Admixture dosage is on total binder, not cement alone.
  2. Admixture per cubic metre = total binder × dosage % ÷ 100.
  3. Per batch = per cubic metre × batch volume. Admixture is a liquid, weighed or metered by volume at a density of about 1.05-1.20.
  4. Water after reduction = baseline water × (1 − reduction rate). Use a measured reduction rate; the 25% in the datasheet may not hold with your materials.
  5. Check the new water-binder ratio = reduced water ÷ total binder, against the design value.

Where it goes wrong

Material and cost

Polycarboxylate superplasticiser runs 2,200-3,000 per tonne, which is 12-20 per m³ at 1.5-2.5% dosage. Trimming 0.3% saves little but costs slump retention and pumpability, and the pumping and labour premium far exceeds the material saved.

On site

Basis

FAQ

Why dose on total binder rather than cement?
Admixtures act on the surface of all hydrating powder. Fly ash and slag hydrate slowly but still adsorb the plasticiser. Dosing on cement alone under-doses by the SCM percentage, which typically shows as an acceptable initial slump that collapses within half an hour - and then someone adds water on site, which ruins the strength.
Is a higher water reduction always better?
No. Higher reduction usually comes with more entrained air and retarder: above 25% you see bleeding, segregation, very long setting times (delaying striking and the next lift), and extreme sensitivity to clay in the aggregate - raising fines from 1% to 3% can halve the effective reduction at the same dose. Practical range is 15-25% with moderate air.
Two kilograms per batch is hard to weigh accurately - what to do?
Weigh it on a 0.1 kg scale, or pre-dilute and meter by volume (converting through the concentration, mixing fresh to avoid settling). Never eyeball it: a 20% dose error is enough to completely change slump loss and setting time.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Admixture Dose Calculator. 2026-10-25. https://jianzhujisuan.com/en/concrete-additive

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.