Concrete Curing and Maturity Calculator

Turn curing temperature into maturity and equivalent age, and check the code minimum.

Quick answer

With the default inputs: Mean curing temperature 20 ℃ · Days cured 7 d · Cement type Ordinary Portland etc.Equivalent age at 20°C 7.0 d

Edit the inputs below to recalculate.

Inputs

℃
d

Result

Equivalent age at 20°C
7.0d
Maturity5040℃·h
Estimated strength65%
Minimum curing7d
Days still required0.0d
To 28-day equivalent21.0d
Temperature factor1.00

The strength percentage is an empirical curve for ordinary Portland cement and is indicative only. Striking, tensioning and loading must follow site-cured specimens or in-situ testing.

Formula

MaturityM = Σ (T + 10) × Δt (T in °C, Δt in hours)
Equivalent agete = t × (T + 10) ÷ 30
Temperature factork = (T + 10) ÷ 30
Minimum curing7 days OPC, 14 days slag, 14 days watertight
Seven days at 20°C gives 5040 °C·h of maturity, an equivalent age of 7.0 days and about 65% strength — just meeting the 7-day minimum for OPC. At a mean of 10°C the equivalent age falls to 4.7 days and strength to about 53%, so curing must be extended.

How to work it out

  1. Record the measured concrete temperature (surface or core), not the weather forecast.
  2. Compute the equivalent age te = actual days × (T + 10) ÷ 30, converting any temperature to days at 20 °C.
  3. Or compute maturity M = Σ(T + 10) × Δt (T in °C, Δt in hours); 600 °C·h is roughly 60% of the 28-day strength at 20 °C.
  4. Set the minimum curing period by cement type: 7 days for ordinary Portland, 14 for slag or pozzolanic, 14 with retarders or where impermeability is required.
  5. Judge striking separately: side forms at ≥1.2 MPa on field-cured specimens (no arris damage), soffits by the strength percentage for the span.

Where it goes wrong

Material and cost

Covers run 1-2 per m² for polythene and 3-5 for geotextile, usually used together. Winter work needs heating (enclosures, heating blankets, thermal blankets) at 3-5 times the normal cost, and that belongs in the winter premium.

On site

Basis

FAQ

Why does winter curing take longer?
Hydration is temperature-driven and roughly halves for every 10°C drop — hence the T+10 term in the maturity function. Seven days at 10°C is only equivalent to 4.7 days at 20°C, a whole strength step lower. In winter, extend curing, insulate or heat, or use an accelerator; summer durations do not transfer.
Is 7 days of curing enough?
That is the code minimum: 7 days for OPC, 14 days with retarders, watertight requirements or slag cement, longer for mass concrete. At 7 days strength is around 65% — enough to strike side forms but still a third short of the 28-day design value. Cure important members for 14 days.
When can formwork be struck?
Side forms once the concrete will not spall — usually 1-2 days. Soffits depend on span: slabs up to 2 m need 50% of design strength, over 2 m need 75%; beams and arches up to 8 m need 75%, over 8 m need 100%; cantilevers need 100%. Those percentages refer to site-cured specimen results, not the estimate here.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Concrete Curing and Maturity Calculator. 2026-10-25. https://jianzhujisuan.com/en/concrete-curing

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.