Convert between grade, MPa, psi and kgf/cm², with cube-to-cylinder correction.

Quick answer

With the default inputs: Grade C30 · Specimen 150 mm cube · Measured strength 0 MPaCube strength 30.0 MPa

Edit the inputs below to recalculate.

Inputs

MPa
Leave 0 to use the grade value; enter a result to back-calculate the grade

Result

Cube strength
30.0MPa
Cylinder strength23.7MPa
psi (cylinder)3437psi
psi (cube)4351psi
kgf/cm²305.9kgf/cm²
Design compressive fc14.3MPa
Design tensile ft1.43MPa
Elastic modulus Ec2.98×10⁴ MPa
US equivalent (rounded)3500psi

The 0.79 cube-to-cylinder factor (up to C50) follows GB/T 50081 and international practice. It is for comparison only and does not replace a test report.

Formula

Cylinder strengthf_cyl = 0.79 × f_cube (up to C50)
psi1 MPa = 145.038 psi
kgf/cm²1 MPa = 10.197 kgf/cm²
Elastic modulusEc = 10⁵ ÷ (2.2 + 34.7/fcu) MPa
C30: 30.0 MPa cube strength — 23.7 MPa as a cylinder (3438 psi, or 4351 psi as a cube) and 306 kgf/cm² — with fc = 14.3 MPa, ft = 1.43 MPa and Ec = 2.98×10⁴ MPa.

How to work it out

  1. Confirm the specimen shape first: a 150 mm cube or a Φ150×300 cylinder. Getting this wrong invalidates everything downstream.
  2. Cube to cylinder × 0.79 up to C50; above C60 the ratio climbs to 0.83-0.86, so stop using 0.79 there.
  3. To psi × 145.038 (1 MPa = 145.038 psi); to kgf/cm² × 10.197.
  4. A grade means the characteristic cube strength: C30 is fcu,k = 30 MPa on 150 mm cubes at 28 days with 95% probability of being exceeded.
  5. For modulus, estimate Ec = 10⁵ ÷ (2.2 + 34.7/fcu) in MPa.

Where it goes wrong

Material and cost

Cube testing runs 50-120 per set of three; rebound testing 300-800 per element; core drilling 400-800 per core. Remediating or demolishing failing concrete costs six figures, so testing is never the place to save.

On site

Basis

FAQ

Does C30 mean 30 MPa?
C30 means a characteristic cube strength of 30 MPa at 28 days under standard curing, with 95% confidence. That is not the design value: the design compressive strength of C30 is only 14.3 MPa after the material partial factor and the prism-to-cube correction. Designing with 30 MPa would be badly unsafe.
Why convert between cube and cylinder?
A cube benefits less from platen restraint and reads higher; a cylinder is closer to the stress state in a real member, so the same concrete tests about 21% higher as a cube. China and Europe use cubes, the US and Japan use cylinders — convert when reading foreign drawings or you will misread the grade.
Can a test result be converted back to a grade?
Only with the age and curing conditions stated. Direct comparison requires 28-day standard curing; site-cured or early-age specimens must first be normalised to 28 days by maturity or an accepted curve. A single failing result does not condemn the concrete — the code allows cores taken from the structure.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Concrete Strength Converter. 2026-10-25. https://jianzhujisuan.com/en/concrete-strength-convert

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.