Site Mix Adjustment Calculator

Enter the lab mix and moisture content to get real batch weights.

Quick answer

With the default inputs: Cement 340 kg/m³ · Sand 700 kg/m³ · Gravel 1200 kg/m³ etc.Water to add per m³ 147.0 kg/m³

Edit the inputs below to recalculate.
Cement1Sand1.84Gravel3Water0.53Per 1 m³ of concrete (schematic)
Sand and gravel moisture is deducted from the added water, not added to it — 5% moisture in sand brings about 40 kg of water per cubic metre, and forgetting it causes segregation.

Inputs

kg/m³
kg/m³
kg/m³
kg/m³
%
%
bags

Result

Water to add per m³
147.0kg/m³
Sand, as batched721.0kg/m³
Gravel, as batched1212.0kg/m³
Water carried by aggregate33.0kg/m³
Water to add147.0kg/m³
Batch factor0.294
Cement per batch100kg
Sand per batch212.1kg
Gravel per batch356.5kg
Water per batch43.2kg

Wet aggregate carries water, so the extra aggregate must be offset by less added water - that is what keeps the water/binder ratio constant. Measure moisture every shift and every two hours in rain; 1% drift in sand moisture moves about 7 kg of water per cubic metre, enough to shift both slump and strength. A negative result means the lab water or the moisture reading is wrong - recheck, do not batch it.

Formula

Wet sand = dry sand × (1 + moisture)same for gravel
Water added = lab water − dry sand×m − dry gravel×mkeeps w/b constant
Batch weight = per m³ × (cement per batch ÷ cement per m³)batch sized to whole bags
C30 lab mix: cement 340, sand 700, gravel 1200, water 180 kg/m³; sand 3% and gravel 1% moisture. Wet sand 721, wet gravel 1212 kg, aggregate brings 33 kg of water, so add only 147 kg. For a two-bag (100 kg) batch the factor is 0.294: sand 212 kg, gravel 356 kg, water 43 kg.

How to work it out

  1. Fix the cement per batch first, in whole bags (50 kg), because nobody weighs half a bag on site.
  2. Scale the design mix to that cement quantity to get the theoretical sand, stone and water per batch.
  3. Actual sand = theoretical sand × (1 + moisture content); the same for stone.
  4. Deduct the water carried in by the aggregates from the total: actual water = theoretical water − sand water − stone water. This is the step that matters.
  5. Verify the water-binder ratio afterwards; it must equal the design value, and adding water to make pumping easier is not allowed.

Where it goes wrong

Material and cost

The price of losing control of moisture is not material cost but failed strength, rebound testing and remedial work — tens of thousands per element. A moisture test takes 5-10 min per batch and costs nothing.

On site

Basis

FAQ

Why not just follow the lab mix and add water as needed?
Water/binder ratio governs strength. Adding water without deducting what the aggregate already carries raises w/b by a real margin - roughly 20 kg extra water per cubic metre costs 3-5 MPa - and promotes bleeding and cracking. Always solve for water first.
How often should moisture be measured, and what about rain?
Once per shift normally, every two hours after or during rain, sampling surface and core separately. The top 10 cm of an open sand pile can run 3-5 points wetter than the core; sampling only the surface over-deducts water and the mix comes out dry.
The calculated water comes out negative - what is wrong?
Three usual causes: the lab water figure assumed a superplasticiser that is not being added on site; the moisture reading is too high (often free water on the sample after rain); or a decimal slip in the aggregate weights. Check moisture first, then the admixture dose.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Site Mix Adjustment Calculator. 2026-10-25. https://jianzhujisuan.com/en/concrete-water-adjust

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.