Door and Window Casing Calculator

Casing metres, pieces and board area from opening size and quantity.

Quick answer

With the default inputs: Opening width 1.5 · Opening height 1.5 · Quantity 4 pcs etc.Total casing length 24.00 m

Edit the inputs below to recalculate.
Length LWidth W
Width and height are the structural opening, not the outside of the frame; linear metres follow the opening perimeter, four sides per window.

Inputs

pcs
Typically 60, 80 or 100 mm
%

Result

Total casing length
24.00m
Perimeter per opening6.00m
With waste25.92m
Pieces to buy11bars
Length bought26.40m
Casing area1.44m²
Backing board (3 sides)18.00m²
External corners per opening2pcs
Mitre joints8joints

Assumes casing on three sides (two verticals plus head); sills are extra. Pieces are usually 2.4 or 3 m, so openings taller than one piece need a joint placed away from eye level.

Formula

PerimeterP = 2 × (width + height)
Total lengthL = P × quantity
With wasteL = L × (1 + waste)
Piecesn = ceil(L ÷ piece length)
Casing areaA = L × casing width
Four 1.5 × 1.5 m windows with 60 mm casing, 2.4 m pieces and 8% waste: 6.00 m per opening, 24.00 m total, 25.92 m with waste, so 11 pieces and 1.44 m² of casing.

How to work it out

  1. An architrave set is a three-sided U: two legs and a head, no bottom. So metres per opening = opening height × 2 + opening width.
  2. Backing board area = (opening width + 2 × architrave width) × (opening height + architrave width), covering the exposed face only.
  3. Total metres = per opening × quantity, times (1 + waste), divided by stock length and rounded up.
  4. Allow 8-12% waste: every corner is mitred at 45°, at least two per opening, and each cut loses usable length.
  5. Count the ironmongery separately: hinges, locks, door stops and seals per leaf; fixings or adhesive by metre.

Where it goes wrong

Material and cost

Veneered MDF 15-30 CNY/m, solid timber 40-90, stainless or aluminium 30-80. Installation 50-120 CNY per opening. A complete residential door set with backing, architrave and ironmongery runs 400-1200 CNY per leaf.

On site

Basis

FAQ

Are door and window casings measured the same?
No. Doors are cased on three sides with nothing at the floor; windows need a sill board in addition, usually projecting 50-100 mm each side with returns. A window casing therefore uses more length and board than a door of the same size — do not price it at the door rate.
How is casing width chosen?
It must relate to skirting height and door proportions. The usual rule is casing equal to or slightly under the skirting: 60 mm casing with 80 mm skirting is commonest, 100 mm casing with 100-120 mm skirting. Too narrow looks flimsy; too wide crowds a small room and eats wall area.
Why do mitres crack?
Timber and MDF move with humidity; a mitre has a large contact area but the two pieces expand in different directions, so the joint opens. Better practice is a scribed or dowelled joint, proper wood glue rather than white glue, and sealing the end grain with finish promptly. Commercial work often uses square corner blocks instead.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Door and Window Casing Calculator. 2026-10-25. https://jianzhujisuan.com/en/door-window-frame

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.