Fence Post Concrete Calculator

Hole and post size to bags per hole.

Also known as post concrete · post hole concrete · fence post footing

Quick answer

With the default inputs: Hole diameter 10 in · Hole depth 30 in · Post size 4 in etc.Bags per post 4 bags

Use your own dimensions ↓

Inputs

in
in
in
pcs
%

Result

Bags per post
4bags
Hole volume1.36ft³
Less post0.28ft³
Net per post1.19ft³
Total bags40bags
Total volume0.44yd³
Total weight1732lb
Post embedment2.5ft
How this is worked out

Net concrete is the hole volume less the buried part of the post. Post section is taken as a square; entering a round post diameter gives close enough. Fence holes commonly run 8-12 in diameter and 24-36 in deep, going to the top of both in soft soil or high wind. In practice two 50 lb bags per post is the standard configuration for a 10 in hole, 30 in deep and a 4x4 post, and that is the order this tool lands on - if yours differs wildly, check whether depth was entered in feet. Put 2-3 in of gravel in the bottom of the hole for drainage; it is not counted here.

Next up: Concrete Volume Calculator · Concrete Mix Design Calculator

Formula

Hole = π × (D/24)² × depth/12D in inches
Post = (side/12)² × depth/12the buried length only
Net = (hole − post) × (1 + waste)
Bags = net ÷ bag yield50 lb 0.375, 60 lb 0.45, 80 lb 0.60 ft³
Ten 4x4 posts in 10 in holes 30 in deep with 10% waste and 50 lb bags: the hole holds 1.36 ft³ and the post takes 0.28 ft³, so net with waste is 1.20 ft³, which is 4 bags per post, 40 bags total, 0.44 cubic yards or about 1730 lb.

How to work it out

  1. Measure the holes you will actually dig - diameter and depth, not a standard size you assume.
  2. Hole volume = π × (diameter/24)² × depth/12, where diameter in inches over 24 gives the radius in feet directly.
  3. Deduct the buried volume of the post (side squared for a square post).
  4. Add 10% waste and divide by bag yield; round up per post, then multiply by the count.
  5. Put 2-3 in of gravel in the bottom for drainage - that is not counted here.

Where it goes wrong

Material and cost

50 lb fast-set is about 6-9 a bag and a post takes 2-4, so 15-35 per post. Across a whole fence, add hole digging (labour or an auger rental at 50-100 a day), posts and concrete - a timber fence complete commonly runs USD 20-45 per linear foot. Digging is the slow part in hard or stony ground.

On site

Basis

FAQ

Why does this say 4 bags when two per post is the usual rule?
It comes down to hole size. A 10 in hole at 30 in deep holds 1.36 ft³, less the 0.28 ft³ that the 4x4 post occupies, which with 10% waste is 1.20 ft³ - exactly 4 bags of 50 lb at 0.375 ft³. The common 8 in by 24 in hole holds only 0.70 ft³, so after the post about 0.52 ft³ is needed and 2 bags do it. That is the 'two bags a post' figure people quote. Measure the holes you are actually digging.
How deep should the post hole be?
The rule is one third of the exposed height, with 24 in as an absolute minimum. In cold regions the hole must go below frost depth or heave lifts the post and the fence leans within a season. In exposed or high-wind sites add a gravel base and dome the concrete away from the post so water runs off.
Fast-setting or regular concrete?
For fence posts fast-setting is far easier: pour it dry into the hole, add water, and it stiffens enough to hold the post in 20-40 minutes, so you can brace and carry on. It costs more per bag and comes out a bit weaker, so load-bearing members - deck and porch posts - want regular mix with reinforcement. Fast-setting cannot be re-wetted: once water is in, that bag has to be used.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Fence Post Concrete Calculator. 2026-10-25. https://jianzhujisuan.com/en/fence-post-concrete

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.