算BuildCalc

Floor Screed Material Calculator

Volume to cement, sand and water by mix ratio.

Quick answer

With the default inputs: Area 100 m² · Thickness 30 · Mix ratio Cement mortar 1:3 etc.Mortar volume 3.15 m³

Edit the inputs below to recalculate.
SubstrateThickness mm
Thickness is the average from structural slab to finished level; in a drained room use the mean depth, not the thinnest point.

Inputs

m²
%

Result

Mortar volume
3.15m³
Area × thickness3.00m³
Volume incl. waste3.15m³
Cement1.26t
Cement bags (50 kg)26bags
Sand1.42m³
Sand weight2.13t
Mixing water (est.)0.76m³

Cement per cubic metre of mortar: about 400 kg for 1:3, 320 for 1:4, 270 for 1:5 and 230 for 1:6, with sand at 0.45-0.50 m³ per m³ and a bulk density of 1.5 t/m³. These are conversions of volumetric proportions; results shift with cement type, sand fineness and moisture. Below 20 mm use self levelling or a bonding agent, otherwise hollow spots and cracks appear; above 50 mm switch to a fine aggregate concrete bed.

Formula

Volume = area × thicknessdivide mm by 1000
Cement = per m³ (by mix) × volume400 / 320 / 270 / 230 kg
Sand = per m³ × volume0.45-0.50 m³/m³
Water ≈ cement × 0.6w/c about 0.6
100 m² at 30 mm with 1:4 mortar: 3.00 m³, 3.15 m³ with 5% waste; cement 1.01 t (21 bags), sand 1.48 m³ (about 2.22 t) and roughly 0.61 m³ of water.

How to work it out

  1. Measure the area and fix the thickness. Use the average thickness: a floor that varies by 20 mm with a 20 mm minimum averages 30 mm, and costing at the minimum loses a third of the material.
  2. Volume = area × average thickness, plus 5-8% waste for handling, spillage and edges.
  3. Convert by mix ratio: 1:3 cement mortar is about 400 kg cement and 1.1 m³ sharp sand per m³; 1:4 about 320 kg and 1.2 m³.
  4. Round cement up to 50 kg bags; buy sand by m³ or tonne (sharp sand bulk density around 1.45 t/m³).
  5. Add bonding agent by area and curing water, and for large areas the saw cuts and filling of movement joints.

Where it goes wrong

Material and cost

Cement mortar screed at 30 mm costs 25-45 CNY/m² including labour; self-levelling 30-60 at 3-5 mm; reinforced fine concrete at 40 mm 45-70. Cement 400-500 CNY/t, sharp sand 100-180 CNY/m³.

On site

Basis

FAQ

Why does screed go hollow and crack?
Four causes: a dirty or unwetted base sucking water out of the mortar and killing bond; too rich a mix shrinking more; too thin a layer (under 20 mm) or over-trowelling that densifies the surface while the core stays weak; and no curing. Codes require at least 20 mm, movement joints in large areas, and water curing from 24 hours for at least 7 days.
Can self-levelling replace sand-cement screed?
It depends. Self-levelling is flat, fast and thin (3-10 mm) - ideal under wood, carpet or vinyl - but weak and water-sensitive, so not for wet areas or as a wearing surface. Sand-cement is strong and water resistant but thicker, slower to cure and dependent on the trowel. A common combination is screed for bulk then self-levelling for finish.
1:3 or 1:4?
Depends on exposure. 1:3 is strong and abrasion resistant, suitable as a wearing surface (garages, warehouses) or under tiles where load matters; 1:4 is the general screed mix - adequate strength, less shrinkage, easier to work; 1:5 and 1:6 are bedding only. More cement is not stronger in practice: 1:2 or 1:1 shrinks so much it cracks and debonds.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Floor Screed Material Calculator. 2026-10-25. https://jianzhujisuan.com/en/floor-screed

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.