Formwork Area Calculator
Pick a member type, enter section and length, and get the formwork contact area plus sheet and batten estimates.
With the default inputs: Member type Rectangular column · Section length 0.5 · Section width 0.5 etc.Formwork area 6.00 m²
Edit the inputs below to recalculate.Inputs
Result
| Member | Column |
| Contact area | 6.00m² |
| Sheet area | 2.98m² |
| Sheets (no reuse) | 3sheets |
| Sheets per set at 3 cycles | 1sheets |
| Timber battens | 2.1m |
| Tie rods | 7bars |
Formwork assumes 1220×2440 mm plywood. Reuse cycles depend on member type and striking strength.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Column | A = 2 × (a + b) × height × qty |
| Beam | A = (width + 2 × depth) × length × qty |
| Slab | A = length × width × qty |
| Wall | A = 2 × length × height × qty |
| Sheets | sheets = A ÷ 2.98 (1220×2440 per sheet) |
How to work it out
- Formwork is measured on contact area between concrete and form — not the surface area of the element and not floor area.
- Columns: perimeter × height, deducting the beam and slab intersection where no form is fixed.
- Beams: soffit (width × clear span) plus two sides (2 × net depth below slab × clear span); the depth within the slab is not formed.
- Slabs: soffit on net area less columns and beams, plus edge form as slab depth × perimeter.
- Walls: both faces less openings, plus reveals.
Where it goes wrong
- Estimating by floor area × a factor — acceptable at scheme stage, but a tender priced that way always loses at final account.
- Measuring beam sides at full depth — the part above the slab soffit is not formed, which overstates a building by 8-12%.
- Forgetting construction joints and openings — form is interrupted there and both sides count, but not as a continuous face.
Material and cost
An all-in formwork rate runs about 45-70 per m² of contact area including labour, material and supports, excluding height extras, with labour at 55-65%. Turnover drives the cost: timber formwork gives 5-8 uses, aluminium gives over 200 but needs about 1,200 per m² up front — only worth it with many repetitive floors.
On site
- Formwork is the largest single item in preliminaries; measure real contact area rather than applying a factor.
- Height above 3.6 m attracts a separate extra — keep it out of the base rate.
- Set the turnover count from the actual number of typical floors; not every project gets eight uses.
Basis
- GB 50666-2011 Code for construction of concrete structures, Chapter 4 (formwork)
- JGJ 162-2008 Technical code for safety of building formwork (loads and checking)
- GB 50204-2015 Code for acceptance of concrete structures, Chapter 4 (formwork)
FAQ
Why measure contact area rather than concrete volume?
Should slab thickness be deducted from beam formwork?
How do reuse cycles affect cost?