Hollow Brick Quantity Calculator
Brick count, mortar volume and bricks per m³ from wall thickness and format.
With the default inputs: Wall length 10 · Wall height 3 · Openings area 0 m² etc.Total bricks 2472 blocks
Edit the inputs below to recalculate.Inputs
Result
| Net wall area | 30.00m² |
| Bricks through thickness | 2blocks |
| Bricks per m² | 80.0blocks/m² |
| Bricks per m³ | 333blocks/m³ |
| Wall volume | 7.20m³ |
| Mortar volume | 1.06m³ |
| Mortar share | 14.7% |
| Mortar mass | 2013kg |
Hollow bricks have 25-35% voids that mortar does not fill, so mortar use is slightly below a solid-brick wall of the same volume. Joints run 8-12 mm, nominally 10 mm.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Net area | A = length × height − openings |
| Through thickness | k = round(thickness ÷ (brick width + joint)) |
| Per m² | n = k ÷ ((length + joint) × (height + joint)) |
| Total | N = ceil(A × n × (1 + waste)) |
| Mortar | V = wall volume − N × brick volume |
How to work it out
- Net wall area A = length × height − openings.
- Blocks through the thickness k = round(wall thickness ÷ (block width + joint)). A 240 wall with 115 mm blocks gives k = 2.
- Blocks per square metre n = k ÷ ((block length + joint) × (block height + joint)).
- Total N = ⌈A × n × (1 + waste)⌉, with waste normally 3%.
- Mortar = wall volume − N × block volume (net), then × 1.05-1.10 for consumption.
Where it goes wrong
- Rounding k down — 240 ÷ 125 = 1.92 rounds down to 1, halving the block count. It must be rounded to nearest.
- Treating hollow bricks as standard bricks — hollow units are 240×115×90, with 90 mm height rather than 53, so blocks per square metre differ by 40%.
- Ignoring the void ratio in weight — hollow brick is 20-30% lighter than solid, and using solid density overstates mortar and haulage.
Material and cost
Fired hollow brick runs 0.55-0.85 each by size and region, cheaper than solid and more mortar-efficient. A 240 wall takes about 80 blocks per square metre: roughly 55 per m² in material and 120-150 per m² with mortar and labour.
On site
- Orient the voids vertically to the load — laying hollow bricks on their side collapses strength.
- Wet the bricks 1-2 days ahead to 10-15% moisture; dry bricks rob the mortar of water.
- Fix ties into the solid webs, never into a void.
Basis
- GB 50203-2011 Code for acceptance of masonry construction, Chapter 5 (brick masonry)
- GB 13544-2011 Fired perforated bricks and blocks
- GB 50003-2011 Code for design of masonry structures, Chapter 3 (material strength)
FAQ
What is the difference between perforated and hollow brick?
Why only 40 bricks per m² in a half-brick wall?
Which mortar grade should I use?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Hollow Brick Quantity Calculator. 2026-10-25. https://jianzhujisuan.com/en/hollow-brick