Masonry Mortar Mix Calculator
Cement, sand and water for M5-M15 mortar by volume, with a batch sheet.
With the default inputs: Mortar volume 1 m³ · Mortar grade M7.5 · Cement class 32.5 etc.Cement 220 kg
Edit the inputs below to recalculate.Inputs
Result
| Cement per m³ | 220kg/m³ |
| 50 kg bags | 5bags |
| Sand (dry) | 1.02m³ |
| Sand (as delivered) | 1509kg |
| Water to add | 250kg |
| Sand per 50 kg cement | 343kg |
| Water per 50 kg cement | 56.9kg |
| Ratio cement : sand | 1 : 6.7 |
Cement contents are common field values and drop when lime putty is used. Added water is net of sand moisture — the step most often skipped on site, and the usual cause of weak mortar.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Cement | M = reference by grade × volume |
| 42.5 class | reference × 0.88 |
| Sand | V = 1.02 × mortar volume (loose) |
| Water to add | W = 280 × V − moisture in sand |
| Strength | 70.7 mm cube at 28 days |
How to work it out
- Look up the baseline cement content by mortar grade: about 190 kg/m³ for M5, 220 for M7.5, 260 for M10 and 320 for M15, with 32.5 grade cement.
- Adjust for cement grade: with 42.5 cement, multiply the baseline by about 0.88.
- Sand is taken as 1.02 m³ loose per m³ of mortar, allowing for moisture and compaction.
- Water follows the required consistency: 280-320 kg/m³ for a masonry mortar at 50-70 mm slump.
- Deduct the water in the sand: actual water = total water − sand weight × moisture content.
Where it goes wrong
- Mixing by volume ratios like 1:3 or 1:6 — those are historical habits with no strength guarantee; proper work needs weight batching and trial mixes.
- Using one mix for M5 and M7.5 — 30 kg/m³ of cement separates the grades, and masonry capacity differs accordingly.
- Not testing sand moisture — it swings 2-8% from the stockpile, and unadjusted water makes the mortar wet and weak.
Material and cost
Ready-mixed M7.5 masonry mortar runs 280-360 per m³; site mixing costs 200-260 per m³ in materials but adds labour and waste. Ready-mixed saves labour and holds quality, which is why it is now the norm.
On site
- Use mortar as mixed: cement mortar within 3 hours and composite mortar within 4; discard beyond that.
- Take one set of test cubes per inspection lot (same mix, same grade, up to 250 m³ of masonry).
- Adjust consistency with the weather: stiffer in summer (70-80 mm), wetter in winter (50-60 mm).
Basis
- JGJ/T 98-2010 Specification for mix proportion design of masonry mortar
- GB 50203-2011 Code for acceptance of masonry construction, Chapter 4 (mortar)
- GB/T 25181-2019 Ready-mixed mortar
FAQ
What does M7.5 mean?
Why deduct the water in the sand?
Is more cement always better in mortar?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Masonry Mortar Mix Calculator. 2026-10-25. https://jianzhujisuan.com/en/masonry-mortar-mix