Mortar Mix Design Calculator

Trial strength, cement, water and sand, and the mix by mass.

Quick answer

With the default inputs: Mortar grade 10 MPa · Measured cement strength 42.5 MPa · Water-cement ratio 0.65 etc.Cement content 210 kg/m³

Edit the inputs below to recalculate.
Cement1Sand1.84Gravel3Water0.53Per 1 m³ of concrete (schematic)
Trial strength is design strength × 1.15 without historical data, and actual cement strength takes a 1.0 margin factor.

Inputs

MPa
Enter 5 for M5, 10 for M10
MPa
32.5 grade enters 32.5
0.6-0.7 for a 50-70 mm flow
kg/L

Result

Cement content
210kg/m³
Trial strength12.00MPa
Strength factor k1.20
Water137kg/m³
Sand1153kg/m³
Water-cement ratio0.65
Cement : sand by mass1 : 5.48
Sand per 50 kg bag274kg
Mortar per 50 kg bag0.238m³
Sand by mass in the mix84.6%

The formula Qc = 1000(fm,o + 15.09) ÷ (3.03 fce) is the JGJ/T 98 regression, with 3.03 and β = −15.09 as given — do not adjust them. The k factor runs from 1.25 down to 1.00 as the grade rises, because assurance requirements are easier to meet at higher strength. Any computed mix must still be verified by trial batches.

Formula

Trial strengthfm,o = k × f2 with k from 1.00 to 1.25
CementQc = 1000(fm,o + 15.09) ÷ (3.03 fce)
WaterQw = Qc × w/c
SandQs = (1000 − Qc/3.10 − Qw) × ρs
Mix by masscement : sand = 1 : Qs/Qc
k values1.25 for M5-7.5, 1.20 for M10, 1.15 for M15
M10 mortar with 42.5 cement at w/c 0.65 and 1.45 kg/L sand: trial strength 12.00 MPa, 210 kg/m³ of cement, 137 kg of water and 1153 kg of sand — a 1:5.49 mix, or 274 kg of sand per 50 kg bag.

How to work it out

  1. Compute the trial strength first: fm,o = fm,k + 1.645σ, with σ taken from the site's control level, normally 2.5 MPa and 3.0 where tighter. For M10 that gives 10 + 1.645 × 2.5 = 14.1 MPa.
  2. Actual cement strength fce = γc × fce,k with γc = 1.0, so a 42.5 grade gives 42.5 MPa.
  3. Cement content by the JGJ/T 98 equation: Qc = 1000(fm,o − β) / (α × fce). For masonry cement mortar α = 3.03 and β = −15.09; for cement-lime mortar α = 1.50 and β = −15.09.
  4. Sand: Qs = 1 − Qc/ρc with ρc the bulk density of cement at 1200-1300 kg/m³, then multiply by the sand bulk density of 1450-1550 kg/m³.
  5. Set water by the water-cement ratio, then trial batch and adjust. The calculation is a starting point, not the answer.

Where it goes wrong

Material and cost

M5 masonry mortar 280-380 CNY/m³, M10 350-480, M15 420-560. Bagged dry mortar sells by the tonne at 15-25% more than site mixing but with consistent quality.

On site

Basis

FAQ

Why not size mortar with a water-cement ratio formula?
Because mortar has no coarse aggregate, so its strength comes from the cement paste binding the sand — a different mechanism from concrete, where Bolomey's formula would be far off. JGJ/T 98 uses a statistical regression tying cement strength directly to the target, which matches trial results better on site. Trials still govern.
Is a 1:3 volume mix good enough?
Workable, but understand that its strength is uncertain. Volume batching lets the cement content swing between 350 and 450 kg/m³ as the sand bulks and wets, which is a whole grade of strength. Proper practice is weighing — especially for load-bearing masonry and large plaster areas, where volume batching is the main cause of scatter.
Does higher cement grade mean less cement?
Yes, but only down to a floor — usually 200 kg/m³. Below that the mortar loses workability and water retention: it will not hang on a trowel or a block, and plaster crazes. So a 52.5 cement for M5 computes at 120 kg but must be raised to 200 with fly ash or lime to restore workability, or the saving costs the quality.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Mortar Mix Design Calculator. 2026-10-25. https://jianzhujisuan.com/en/mortar-strength

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.