Paint Coverage Calculator

Enter room size, ceiling height, openings and number of coats to get total area, litres needed and how many cans to buy.

Quick answer

With the default inputs: Room length 5 · Room width 4 · Ceiling height 2.8 etc.Paintable area 66.4 m²

Edit the inputs below to recalculate.
Length LWidth W
Area is the developed surface; one coat versus two differs mainly in thinning.

Inputs

m²
coats
Typical is one primer plus two top coats
m²/L
Per coat: 10-12 m²/L for emulsion, 8-9 for dark colours

Result

Paintable area
66.4m²
Wall area46.4m²
Ceiling area20.0m²
Primer (1 coat)6.6L
Top coat (2)13.3L
Total paint19.9L
5 L cans4cans
18 L cans2cans

Coverage depends on substrate absorption and application method; follow the product datasheet.

Formula

Wall areaA_wall = 2 × (L + W) × H − openings
CeilingA_ceiling = L × W
Total areaA = A_wall + A_ceiling
PrimerV_primer = A ÷ coverage
Top coatV_top = A × coats ÷ coverage
CansN = ceil(total volume ÷ can size)
A 5×4 m room at 2.8 m with 4 m² of openings: 46.4 m² of wall plus 20 m² ceiling = 66.4 m². That is 6.6 L primer and 13.3 L of top coat, about 20 L total, so two 18 L cans.

How to work it out

  1. Measure the net perimeter, deducting fixed cabinetry that backs onto the wall.
  2. Use the clear height from finished floor to ceiling soffit, not the structural storey height.
  3. Wall area = net perimeter × clear height − opening area. Ceiling is a separate length × width, never multiplied by height.
  4. Multiply by the number of coats and divide by the spreading rate. Take 85% of the published rate: thinning, roller retention and substrate absorption all take a cut.
  5. Round up to whole containers. Base coat and top coats are costed separately — one primer plus two finish coats is standard.

Where it goes wrong

Material and cost

Contract emulsion 15-40 CNY per litre, branded interior paint 80-150, imported 200+. Labour 12-18 CNY/m² per coat; full preparation including skim and sanding brings it to 35-60 CNY/m². Figures cover paint only, not skim or labour.

On site

Basis

FAQ

Why not just multiply floor area by 3?
Floor area × 3 is a rough rule of thumb. The real ratio depends on ceiling height and room shape: about 2.8-3.2 for a squarish room at 2.8 m, over 3.8 at 3.3 m, and more than 5 for a long corridor. Measuring the actual dimensions is accurate to within about 5%.
Is one primer plus two top coats necessary?
For new or patched walls, yes. Primer seals the substrate and evens out absorption, which saves top coat and prevents patchy colour. On sound existing walls a combined primer-and-topcoat product works. Going from dark to light needs an extra coat or a white primer first.
Why does the calculated volume come up short?
Three reasons: highly absorbent substrates such as new plaster or unsealed drywall use 20-30% more; dark colours cover about 20% less area per litre; and roller application uses less paint but often needs an extra coat. Add 10% on top of the result rather than ordering exactly.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Paint Coverage Calculator. 2026-10-25. https://jianzhujisuan.com/en/paint-coverage

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.