Putty Quantity Calculator
Area × coats × consumption to bags.
With the default inputs: Area 200 m² · Coats 2 coats · Putty type Water resistant etc.Total putty 540 kg
Edit the inputs below to recalculate.Inputs
Result
| Consumption per coat | 1.35kg/m² |
| Coats | 2coats |
| Total per m² | 2.70kg/m² |
| Bags (whole) | 27bags |
| Purchased weight | 540kg |
Consumption figures are empirical: water-resistant putty about 1.2-1.5 kg/m² per coat, standard 0.8-1.0, gypsum levelling 1.8-2.5. Losses come from substrate absorption (fresh plaster drinks a lot) and levelling thickness on uneven walls. Wet areas such as kitchens, bathrooms and basements must use water-resistant (type N) putty; standard putty powders and falls off in damp - the usual cause of peeling walls a year after decoration.
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Per coat = base consumption × substrate factor | |
| Total = per coat × coats × area | |
| Bags = ceil(total ÷ bag size) |
How to work it out
- Establish the skimming area: walls (perimeter × clear height − openings) plus ceilings; balconies and corridors separately.
- Set the unit rate by substrate: bare concrete 1.8-2.2 kg/m² per coat, cement render 1.2-1.6, plasterboard or gypsum 0.8-1.2.
- Multiply by the number of coats. Two coats plus sanding is standard; three where flatness is poor or wallpaper follows.
- Divide by the bag weight and round up, keeping 5% for corners and making good around sockets.
- Buy water-resistant and standard putty separately: type N for bathrooms, kitchens and basements, type Y elsewhere.
Where it goes wrong
- Using 1 kg/m² per coat across the board — bare concrete absorbs far more and needs over 2 kg, so the job runs short halfway through.
- Reading the two-coat rule as two coats of putty — in practice it means two putty coats plus a sanding pass, and many sites do three; quantity and price must match.
- Standard putty in wet rooms — it powders and falls away with moisture; type N is mandatory, and the waterproofing goes underneath.
- Applying thick coats to save labour — anything over 1 mm per coat crazes and shells off, and over 3 mm total it debonds. Thin and many beats thick and few.
Material and cost
Standard putty 25-45 CNY per 20 kg bag, water resistant 40-70. Labour with sanding 8-15 CNY/m²; full preparation including stripping and primer 20-35 CNY/m².
On site
- Each coat must be surface dry before the next — press with a finger and it should not stick, typically 4-6 hours, overnight in humid weather.
- Sand with 240-320 grit; water-resistant putty sands best while still slightly green, since fully cured it is hard work and dusts in lumps.
- Inspect with a raking light. Waves and pinholes only show in side light, never face on.
Basis
- JG/T 298-2010 Putty for interior building use
- GB 50210-2018 Code for acceptance of building decoration, Chapter 4 (plastering)
- GB 50327-2001 Code for construction of residential decoration, Chapter 4
FAQ
Why is water-resistant putty both dearer and heavier to use?
How many coats, and can one thick coat do?
Putty versus gypsum levelling?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Putty Quantity Calculator. 2026-10-25. https://jianzhujisuan.com/en/putty-quantity