Rebar Anchorage Length Calculator

Basic and seismic anchorage length from bar grade, diameter and concrete class.

Quick answer

With the default inputs: Bar grade HRB400 · Bar diameter 20 · Concrete class C30 etc.Anchorage length la 705 mm

Edit the inputs below to recalculate.
ConcreteΦ dAnchorage la
la runs from the embedded end to the concrete face; if the span is short, use a hook or mechanical anchor.

Inputs

Result

Anchorage length la
705mm
Design strength fy360N/mm²
Design tensile ft1.43N/mm²
fy / ft251.7
Shape factor α0.14
Correction ζa1.00
Calculated value705mm
Seismic anchorage laE705mm
In bar diameters35.2d

Uses la = α(fy/ft)d from GB 50010, without the beneficial corrections for cover and confining reinforcement. Structural design must follow the full code and the design documents.

Formula

Basic anchoragela = α × (fy ÷ ft) × d
Shape factor α0.16 plain bars, 0.14 deformed bars
Correctionsζa = 1.10 (d>25) × 1.25 (epoxy coated)
SeismiclaE = ζaE × la (1.15 for class I-II, 1.05 for III-IV)
Minimumla not less than 200 mm
HRB400, 20 mm, C30, non-seismic: fy = 360 and ft = 1.43 give la = 0.14 × 251.7 × 20 ≈ 705 mm, about 35 bar diameters.

Basic anchorage length la for HRB400 tension bars (mm, non-seismic)

BarC25C30C35C40
HRB400 Φ12480425390355
HRB400 Φ14560495450415
HRB400 Φ16635565515475
HRB400 Φ18715635580535
HRB400 Φ20795705645590
HRB400 Φ22875780710650
HRB400 Φ25995885805740

How to work it out

  1. Look up the basic anchorage length lab from bar grade, concrete grade and diameter, per the code table.
  2. Apply the modification factor: 1.1 for deformed bar over 25 mm, 1.25 for epoxy coating, 1.1 for construction disturbance, with reductions where cover is generous.
  3. Apply the seismic factor: 1.15 for class 1 and 2, 1.05 for class 3, 1.00 for class 4.
  4. That gives the seismic anchorage length lae — check it against the drawing.
  5. Compression anchorage is 0.7 times the tension value, but never less than 200 mm.

Where it goes wrong

Material and cost

Anchorage length drives steel quantity directly: every 10% added to lae adds roughly 3-5% of end anchorage steel. At about 4000 per tonne, getting one grade wrong on a 30,000 m² project is 80,000-150,000 of material. That is not a saving to be optimised — it is structural safety.

On site

Basis

FAQ

How does anchorage length differ from lap length?
Anchorage length is the minimum embedment for one bar to develop its force through bond with the concrete. Lap length transfers force between two bars; each carries only part of it and a joint factor of 1.2-1.6 applies, so a lap is always longer than the anchorage.
Why the 1.1 factor above 25 mm?
Large bars have a lower bond-area-to-section ratio and are harder to encase properly during placing, so bond is relatively poorer. The code compensates with 1.1. Congested heavy bars also tend to leave voids underneath, so vibration and aggregate size matter as much as extra length.
Why longer anchorage in seismic design?
Under earthquake action, bars in joints may yield and even overstrength, exceeding design forces, while reversed cyclic loading degrades bond. Seismic detailing multiplies anchorage by 1.15 for class I-II and 1.05 for III-IV, with confining hoops. Frame joints are where this fails most often.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Rebar Anchorage Length Calculator. 2026-10-25. https://jianzhujisuan.com/en/rebar-anchorage

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.