Rebar Hook Length Calculator

Added length for three hook types, with the seismic tail check.

Quick answer

With the default inputs: Bar diameter 8 · Hook type 135° stirrup hook · Seismic detailing Seismic etc.Added length per hook 95.2 mm

Edit the inputs below to recalculate.
Bar diameter mmStraight tail for mm135°
Hook allowance depends on type: 6.25d semi-circular, 3.5d straight, 11.9d for a 135° stirrup hook. Tail is the straight extension.

Inputs

Result

Added length per hook
95.2mm
Hook type135° stirrup hook
Tail requirement80mm
Governing value10d
Arc allowance15.2mm

6.25d for a 180° hook is the customary value for plain bars (including a 3d tail). For 135° stirrup hooks, GB 50204 and seismic detailing require a tail of at least 10d and 75 mm; non-seismic at least 5d. Arc allowances are 1.9d for 135° and 0.5d for 90°, which with the tail give the familiar 11.9d and 3.5d. The hook allowance is added on top of the centreline length - do not mix it with bend deductions. Ribbed bars normally have no end hook; anchorage length or mechanical anchorage does the job.

Formula

180° hookadd 6.25d (includes a 3d tail)
90° hooktail + 0.5d
135° stirrup hookseismic max(10d, 75) + 0.5d; else max(5d, 75) + 0.5d
Seismic tailat least 10d and 75 mm
Φ8 stirrup with seismic detailing: tail max(10×8, 75) = 80 mm plus 1.9×8 = 15.2 mm of arc, so 95.2 mm per hook (the familiar 11.9d). A closed stirrup has two hooks, adding 190.4 mm.

How to work it out

  1. Set the extension by hook type: a 180° semicircular hook adds 6.25d, including a 3d straight tail.
  2. A 90° hook adds the straight tail plus 0.5d for the bend.
  3. A 135° hook (stirrups) adds the tail plus 0.5d, with the tail at max(10d, 75 mm) in seismic work and max(5d, 75 mm) otherwise.
  4. Check the tail: seismic stirrup tails are at least 10d and at least 75 mm, whichever governs.
  5. Total length = net member dimension + hook extensions, counted per hook.

Where it goes wrong

Material and cost

Hooks add 3-8% to bar length — small, but they must never be missed. Fabrication adds about 0.1-0.3 per bar per hook.

On site

Basis

FAQ

Why do plain bars need hooks but ribbed bars do not?
Different bond mechanics. Plain bars are smooth and rely on a 180° hook to mechanically anchor; ribbed bars develop anchorage through rib interlock, so hooks can be omitted. The hook on a plain bar is structural - make it too short and the bar pulls out at the joint.
Why both 10d and 75 mm?
They address different failure modes. 10d scales the tail with bar diameter; 75 mm is an absolute floor so that small bars (Φ6 gives only 60 mm at 10d) cannot slip out once concrete crushes. Taking the larger value means 75 mm governs for small bars and 10d for large ones.
Do hook allowance and bend deduction double-count?
No, but order matters: subtract bend deductions from the out-to-out total to get centreline length, then add the hook allowance. They act at different places - deductions at intermediate bends, allowance at the end. For a stirrup with four 90° bends and one 135° hook: out-to-out minus 4×deduction plus hook allowance.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Rebar Hook Length Calculator. 2026-10-25. https://jianzhujisuan.com/en/rebar-hook-length

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.