Rebar Mesh Weight Calculator

Weight per square metre and total mesh weight from dimensions and spacings.

Quick answer

With the default inputs: Mesh length 6 · Mesh width 2 · Longitudinal spacing 200 etc.Weight per m² 4.21 kg/m²

Edit the inputs below to recalculate.
Longitudinal spaci mmTransverse spacing mmBar diameter mm
The two pitches are longitudinal and transverse; diameter is the nominal bar size. Φ8 at 200 both ways runs about 5 kg/m².

Inputs

Result

Weight per m²
4.21kg/m²
Area12.00m²
Longitudinal bars11bars
Transverse bars31bars
Total length128.0m
Unit weight0.395kg/m
Total weight50.5kg
Steel per m²4.2kg/m²

Laps and waste are excluded — allow 3-5% extra when ordering. For equal spacings, steel per m² can be estimated quickly as 2 × unit weight ÷ spacing in metres.

Formula

Longitudinaln1 = floor(width ÷ s1) + 1
Transversen2 = floor(length ÷ s2) + 1
Total lengthL = n1 × length + n2 × width
Total weightW = L × 0.00617 × d²
Per m²w = W ÷ (length × width)
A 6 × 2 m mesh at 200 mm both ways with Φ8: 11 longitudinal bars totalling 66 m and 31 transverse totalling 62 m, so 128 m, 50.5 kg and 4.21 kg/m².

How to work it out

  1. Bars along the length: n1 = ⌊mesh width ÷ spacing⌋ + 1.
  2. Bars across the width: n2 = ⌊mesh length ÷ spacing⌋ + 1.
  3. Total length = n1 × mesh length + n2 × mesh width.
  4. Total weight = total length × 0.00617 × d².
  5. Weight per square metre = total ÷ (length × width), a useful shortcut for pricing.

Where it goes wrong

Material and cost

Welded mesh D8@200 runs 4,500-5,200 per tonne and beats site tying on labour, but is uneconomic on small or irregular areas. Tying Φ8 on site costs 600-900 per tonne in labour.

On site

Basis

FAQ

Is 4 kg/m² typical?
For Φ8 at 200 mm both ways the field figure is 3.95-4.2 kg/m², so 4.21 is normal once integer bar counts are allowed for. For reference: Φ8@150 is about 5.5, Φ10@200 about 6.2 and Φ12@200 about 8.9 kg/m². Ground slabs commonly use Φ8 or Φ10 at 200 mm.
How much mesh lap is needed?
At least 300 mm and not less than 30d, lapped in both directions where the mesh is two-way, with staggered positions and no more than 50% lapped at one section. Welded wire mesh often uses one grid plus 100 mm, roughly 300-400 mm, plus anchorage at edges.
Is prefabricated mesh or site tying cheaper?
For large, uniform areas prefabricated mesh saves labour and lays 3-5 times faster with accurate spacing, but comes in fixed sizes and wastes 5-10% cutting around irregular edges. Site tying is more flexible for small or complex shapes and double layers. Either way, add waste to the net weight.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Rebar Mesh Weight Calculator. 2026-10-25. https://jianzhujisuan.com/en/rebar-mesh

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.