算BuildCalc

Roof Drainage Calculator

Catchment area to flow to downpipe count.

Quick answer

With the default inputs: Catchment area 1000 m² · Slope factor 1.0 · Storm intensity q5 300 L/(s·ha) etc.Design storm flow 30.00 L/s

Edit the inputs below to recalculate.

Inputs

m²
L/(s·ha)

Result

Design storm flow
30.00L/s
Effective catchment1000m²
Capacity per downpipe12.0L/s
Downpipes required3bars
Flow per downpipe10.00L/s
Utilisation83%
Overflow capacity reference30.00L/s

Q = catchment area × intensity ÷ 10000 (area in m², intensity in L/(s·ha), result in L/s). The storm intensity must come from the local rainfall formula for a 5-minute duration and the design return period (usually 2-5 years); the default 300 here is only an example. The capacities quoted (DN75 about 8, DN100 15, DN150 30, DN200 55 L/s) are order-of-magnitude values for full-bore gravity flow; the real figures depend on stack height, pipe roughness and whether the system is pressurised - confirm to GB 50015 and product data. Significant roofs should also have overflows, normally taken as no less than the design flow but always confirmed against GB 50015 and local requirements.

Formula

Q = F × q5 ÷ 10000F in m², q5 in L/(s·ha), Q in L/s
Downpipes = ceil(Q ÷ capacity)at least one
Effective area = plan area × slope factorabove 1 for steep roofs
1000 m² flat roof, local q5 = 300 L/(s·ha), DN100 downpipes at 0.8 fill giving 12 L/s: design flow 30.00 L/s needs 3 downpipes (10.00 L/s each, 83% utilisation) and overflows of at least 30.00 L/s.

How to work it out

  1. Establish the catchment: the horizontal projected roof area, not the sloped area. Pitched roofs take an additional factor — 1.0 up to about 30°, 1.1-1.3 beyond.
  2. Look up the local rainfall intensity and take q for the design return period in L/(s·ha). Five years for housing, ten for important buildings, and this value drives the pipe size.
  3. Flow Q = q × F × ψ ÷ 10000, with F in m² and ψ the runoff coefficient (0.9-1.0 for roofs); the 10000 converts m² to hectares.
  4. Look up the capacity of one downpipe by diameter: gravity flow roughly 8-10 L/s at DN75, 12-20 at DN100, 30-45 at DN150, depending on gutter depth and stack height.
  5. Downpipes = Q ÷ (capacity × reduction factor), rounded up. The factor allows for blockages and is normally 0.8.

Where it goes wrong

Material and cost

uPVC downpipe DN100 25-45 CNY/m, cast iron 60-120, HDPE 40-80. Roof outlets 80-200 each, installation 15-30 CNY/m. Siphonic systems cost 1.5-2 times gravity systems.

On site

Basis

FAQ

Why not use one national storm intensity?
Regional variation is enormous - for the same 5-minute duration, coastal south China can exceed 400 L/(s·ha) while arid north-west runs just over 100, a three to four fold difference. A single value would undersize the south (ponding, overflow, even backflow) and oversize the north. Use the published local formula for the project city and return period.
Why add overflows if the downpipes are sized correctly?
Downpipes clog with leaves and debris, and storms exceed the design return period. Overflows are the last line of defence: once gutter level reaches the overflow, water discharges outside instead of leaking at upstands or overloading the roof. Overflows on important buildings are normally sized at no less than the design flow (confirm to GB 50015 and local rules) and must never sit above walkways or entrances.
Does this work for siphonic systems?
No. Siphonic systems run full-bore under negative pressure and a single DN100 outlet can carry three to five times the gravity flow, but only with a proper hydraulic design and proprietary outlets; pipe sizes, hanger slopes and lengths are tightly constrained, and mistakes cause vibration, noise or collapsed pipe. Use the manufacturer or dedicated software. This tool is gravity flow only.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Roof Drainage Calculator. 2026-10-25. https://jianzhujisuan.com/en/roof-drainage

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.