Roof Flashing Calculator
Flashing is measured on developed width; fixings every 300 mm.
With the default inputs: Parapet 40 m · Gutter 20 m · Pipes through roof 4 pcs etc.Total flashing run 62.4 m
Use your own dimensions ↓Inputs
Result
| Parapet / gable | 40.0m |
| Gutter / valley | 20.0m |
| Pipes (perimeter total) | 2.4m |
| Developed area incl. laps | 20.6m² |
| Sheet unit weight | 4.71kg/m² |
| Total sheet weight | 97.0kg |
| Fixings (two rows) | 418pcs |
How this is worked out
Flashing is the waterproofing at junctions between the roof and vertical elements - parapets, gables, pipes and rooflights. About 70% of roof leaks come from these junctions rather than the field of the roof. Measure each run separately: parapets and gables by length, gutters and valleys by length, and pipes by perimeter times number. Developed width is the flat width before folding; parapet flashing is normally 250-300 mm (150 mm upstand plus 100-150 mm on the flat) and gutter flashing is wider. Sheet unit weight is thickness × 7850 kg/m³, so 0.6 mm is about 4.71 kg/m². Allow 10% for laps of 50-100 mm per length, with corners and stop ends counted separately. Fixings are estimated at one every 300 mm in two rows, plus extra at corners and ends. The top edge must be set into a groove or held by a cover bar and sealed - fixings alone with an open top edge let water track behind the sheet.
Next up: Roof Tile Calculator · Roof Sheathing Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| Total run | L = parapet + gutter + pipes × perimeter |
| Developed area | A = L × width × (1 + lap) |
| Unit weight | q = thickness(mm) × 7.85 (kg/m²) |
| Total weight | W = A × q |
| Fixings | n = (L / 0.30 + 1) × 2 |
Basis
- GB 50345-2012 — technical code for roof works: flashing, upstands and counter-flashing
- GB 50345-2012 — minimum upstand heights at parapets and walls
FAQ
Why does flashing leak so often?
How thick should flashing be?
Cite this page
Use this format in reports, method statements or coursework. The link is permanent.
Building Calculator. Roof Flashing Calculator. 2026-10-25. https://jianzhujisuan.com/en/roof-flashing