Roofing Shingle Calculator
Roof area to squares, bundles and ridge cap.
Also known as roof square calculator · roofing squares · shingle squares
With the default inputs: Roof area 1500 ft² · Shingle type Architectural · Ridge and hip length 60 ft etc.Roofing squares 16.5 sq
Use your own dimensions ↓Inputs
Result
| Area with waste | 1650ft² |
| Shingle type | Architectural |
| Shingle bundles | 50bundles |
| Ridge cap bundles | 2bundles |
| Starter course (est.) | 156ft |
| Weight per bundle | 78lb |
| Weight per area | 2.4lb/ft² |
| Total weight | 3960lb |
| Short tons | 1.98ton |
How this is worked out
One square is 100 ft², the only unit roofing is priced in. Both 3-tab and architectural run three bundles to the square - same count, but architectural bundles are heavier (75-80 lb) and expose less, so the two are not interchangeable. The tool estimates weight at 2.2 lb/ft² for 3-tab and 2.4 lb/ft² for architectural, with bundles held at the nominal three to the square - same bundle count, different tonnage, and hauling and roof-loading labour both follow the weight, so pricing architectural at the 3-tab density under-orders by about a tenth. Order against the manufacturer coverage figure, since exposure varies by product. Waste follows the shape: 10% for a simple gable, 15% with hips or skylights, 20% on complex or steep roofs with lots of cutting. Starter strip goes along the eaves under the first course and is usually measured from eave length - the perimeter figure here is an approximation, so scale it off the drawing. Skipping starter is why the first course lifts in wind, the most common starting point for storm damage. Ridge cap runs about 35 ft to the bundle, and more hips means more bundles.
Next up: Skirting Board Calculator · Plasterboard Quantity Calculator
Reverse: known result, work out one input
Enter a target result; the other inputs stay fixed and this one is worked out.
Formula
| 1 square = 100 ft² | the roofing unit |
| Squares = area × (1+waste) ÷ 100 | |
| Bundles = squares × 3 | same for 3-tab and architectural |
| Ridge cap = ridge length ÷ 35 | about 35 ft per bundle |
How to work it out
- Work out roof area: projected area times the slope factor (1.054 at 4/12, 1.118 at 6/12, 1.202 at 8/12), plus 5-10% for hips.
- Divide by 100 for squares - the only unit roofing is sold in.
- Bundles = squares x 3, the same for 3-tab and architectural.
- Ridge cap is ridge length ÷ 35, and more hips means more bundles.
- Waste follows the shape: 10% simple gable, 15% with hips or skylights, 20% complex or steep.
Where it goes wrong
- Using the building footprint as roof area - that skips the slope factor, which understates by 5% at 4/12 and up to 40% on a steep roof.
- Confusing squares with shingle count - a square is 100 ft², not 100 shingles, and one shingle covers less than a square foot.
- Omitting starter strip - without it the first course lifts in wind, the usual start of storm damage.
Material and cost
Architectural shingles run USD 90-140 per square in material, with 3-tab cheaper at 70-100. Tear-off is 50-100 per square and installation labour 100-200 per square. A full re-roof including strip, underlayment, shingles and ridge cap commonly lands at 350-550 per square, so a 1500 ft² roof is roughly 5000-8000.
On site
- Order the whole job at once and note the lot number - colour varies visibly between lots and a top-up rarely matches.
- Do not leave bundles stacked on the roof for more than a day or two: uneven load on the trusses, and wind gets under them.
- Check the underlayment is continuous before shingling - the shingles are not the waterproofing, the layer beneath is.
Basis
- ASTM E108 Standard Test Methods for Fire Tests of Roof Coverings
- IRC International Residential Code, Chapter R905 (roof covering requirements)
- NRCA Roofing Manual (US installation guidance)
- BS 5534:2014+A2:2018 (UK equivalent, for cross-checking areas)
FAQ
How do I work out roof area?
Why 10-20% waste?
Do I have to strip the old shingles?