Room Area Calculator

Floor, ceiling, walls, skirting and volume, all at once.

Quick answer

With the default inputs: Room length 6 · Room width 4 · Clear height 2.8 etc.Floor area 24.00 m²

Edit the inputs below to recalculate.
OpeningRoom length mRoom width mClear height m
Length and width are clear dimensions excluding plaster; clear height runs floor to ceiling — not storey height, which adds the slab and finish.

Inputs

Floor to ceiling, not storey height
m²
Door and window openings, added up
Skirting stops at door openings

Result

Floor area
24.00m²
Ceiling area24.00m²
Perimeter20.00m
Gross wall area56.00m²
Openings deducted4.00m²
Net wall area52.00m²
Skirting length19.10m
Room volume67.20m³
Wall to floor ratio2.17
Walls share of painted area52%

These are clear dimensions between finished faces, not grid lines. Floor and ceiling are equal only in the ideal case; deduct beams, service shafts and boxing where present. Skirting is perimeter less door widths, without deducting architraves.

Formula

Floor / ceilingA = length × width
PerimeterP = 2 × (length + width)
Gross wall areaA = P × clear height
Net wall areaA = gross − openings
SkirtingL = P − total door width
VolumeV = length × width × clear height
A 6 × 4 m room at 2.8 m clear height with 4 m² of openings and a 0.9 m door: 24.00 m² floor and ceiling, 52.00 m² of net wall, 19.10 m of skirting, 67.20 m³ of volume and a wall-to-floor ratio of 2.17.

How to work it out

  1. Measure clear internal dimensions rather than reading them off drawings. In a shell-and-core flat, wait until plastering is complete — blockwork clear sizes typically run 2-3 cm small per wall, which is 0.24 m² on a 4 m wide room.
  2. Floor and ceiling areas are identical, both length × width. Where the ceiling has bulkheads or downstand beams, add the developed area separately.
  3. Gross wall area = perimeter × clear height. Perimeter is 2 × (length + width) and clear height runs from finished floor to ceiling soffit, not structural storey height.
  4. Deduct openings to get net area. Bay windows, full-height glazing and door openings all come off, but niches and built-in recesses do not — they still get skimmed and painted.
  5. Skirting length = perimeter − total door opening width. No skirting runs across a doorway, and this is where two to four metres is routinely over-ordered.
  6. Room volume = length × width × clear height, used for cooling load, fresh-air rate and coating VOC release.

Where it goes wrong

Material and cost

These figures underpin every subsequent quantity: floors (tiling, timber, self-levelling), walls (skim, paint, wallpaper), ceilings (suspension, emulsion) and skirting. A 10% error here propagates 10% through all four.

On site

Basis

FAQ

Why not just multiply floor area by 3 for walls?
The “times 3” rule is a fit-out shortcut that only holds for roughly square rooms at 2.7-2.8 m. The longer the room, the worse it gets: a 6 × 4 m room has a wall-to-floor ratio of 2.17 while 3 × 8 m gives 1.83 — nearly 20% apart. Wall area drives paint and filler quantities, and running short mid-job risks a colour mismatch.
Should openings be deducted?
Yes for finishes such as paint, wallpaper and wall tiles. For filler and primer either is accepted and most estimators leave them in as margin. But the reveals — the inside faces of the opening — must be added: a 1.5 × 1.5 m window in a 200 mm wall has about 1.2 m² of reveal, so four windows is close to 5 m² that is easily forgotten.
How do clear height and storey height differ?
Storey height runs between structural floors; clear height runs from finished floor to underside of ceiling, the difference being slab thickness plus floor build-up. A 3.0 m storey usually gives 2.7-2.8 m clear. Wall areas must use clear height — using storey height overstates by about 10%, two extra tubs of paint across ten rooms.

Cite this page

Use this format in reports, method statements or coursework. The link is permanent.

Building Calculator. Room Area Calculator. 2026-10-25. https://jianzhujisuan.com/en/room-area

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.